Data center in Zürich
Data center in Zürich is an operational data center in Zürich, Switzerland. Our footprint estimate of its power is about 5.9 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 5.9 MW (range 2.9 MW to 9.4 MW) Estimate from building footprint, low confidence. Footprint estimate: about 4,910 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,500 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Aargauerstrasse 10d, 8048, Zürich |
| Coordinates | 47.39296, 8.49965 |
Power and grid
| Grid carbon intensity | 39 g CO₂ per kWh (Switzerland, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | hydro 52.3%, nuclear 29.9%, solar 12.1%, oil and other fossil 1.9%, bioenergy 1.6%. Clean power: 97.7% |
Climate and water
| Average temperature | 9.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 33.5 °C (2001 to 2025) |
| Cooling degree days | 117 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.4 kWh per m² per day |
| Wind at 50 m | 4.3 m/s average |
| Water stress today | Low (<10%) (Switzerland) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Zürich use?
We estimate the facility power at about 5.9 MW. Estimate from building footprint, low confidence.
How clean is the power for Data center in Zürich?
The grid in Switzerland emits about 39 g CO₂ per kWh (2025). Largest sources: hydro 52.3%, nuclear 29.9%, solar 12.1%.
Data centers near Zürich
- colozueri.ch Zurich 1.1 km
- Equinix ZH2 - Zurich 1.7 km
- Rechenzentrum Albis 1.8 km · 4.6 MW
- Templus DC Zurich ZRH01 2.0 km
- Equinix ZH5 - Zurich, South 3.2 km · 7.2 MW
- aspectra Zürich 3.3 km
- Green Datacenter ZRH3 (fka: Green Schlieren) 4.8 km · 0.8 MW
- OIZ 5.4 km
Sources
Correct this page or get the data