Rechenzentrum Albis
Rechenzentrum Albis is an operational data center operated by Organisation und Informatik der Stadt Zürich in Zürich, Switzerland. Our footprint estimate of its power is about 4.6 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Organisation und Informatik der Stadt Zürich |
| Facility power | 4.6 MW (range 2.3 MW to 7.3 MW) Estimate from building footprint, low confidence. Footprint estimate: about 3,818 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Albisriederstrasse 245, 8047, Zürich |
| Coordinates | 47.37753, 8.49488 |
| Website | stadt-zuerich.ch/hbd/de/index/entwicklungsgebiete/letzi/projekte_realisiert/rechenzentrum_oiz_albis.html |
Power and grid
| Nearest high-voltage substation | Unterwerk Altstetten, 150 kV, 700 m away (EWZ) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Quartierunterwerk Seebach, 220 kV, 6.8 km away |
| HV substations within 10 km | 26 |
| Power plants within 50 km | 5.2 GW in 56 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 39 g CO₂ per kWh (Switzerland, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.3%, nuclear 29.9%, solar 12.1%, oil and other fossil 1.9%, bioenergy 1.6%. Clean power: 97.7% |
Climate and water
| Average temperature | 9.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 33.5 °C (2001 to 2025) |
| Cooling degree days | 117 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.4 kWh per m² per day |
| Wind at 50 m | 4.3 m/s average |
| Water stress today | Low (<10%) (Switzerland) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Rechenzentrum Albis use?
We estimate the facility power at about 4.6 MW. Estimate from building footprint, low confidence.
How close is Rechenzentrum Albis to the power grid?
The nearest high-voltage substation in OpenStreetMap is Unterwerk Altstetten (150 kV), about 700 m away.
How clean is the power for Rechenzentrum Albis?
The grid in Switzerland emits about 39 g CO₂ per kWh (2025). Largest sources: hydro 52.3%, nuclear 29.9%, solar 12.1%.
Who operates Rechenzentrum Albis?
Organisation und Informatik der Stadt Zürich.
Data centers near Zürich
- colozueri.ch Zurich 653 m
- Data center in Zürich 1.8 km · 5.9 MW
- Equinix ZH2 - Zurich 2.2 km
- Templus DC Zurich ZRH01 2.4 km
- aspectra Zürich 2.7 km
- Equinix ZH5 - Zurich, South 4.0 km · 7.2 MW
- Green Datacenter ZRH3 (fka: Green Schlieren) 5.2 km · 0.8 MW
- OIZ 6.7 km