Equinix ZH5 - Zurich, South is an operational data center operated by Equinix in Zurich, Switzerland. Our footprint estimate of its power is about 7.2 MW.

Key facts

StatusOperational
OperatorEquinix
Facility power7.2 MW (range 3.6 MW to 12 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 6,016 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 3,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks53 networks, 4 internet exchanges
PeeringDB.
Also known asEquinix ZRH5
AddressAllmendstrasse 13, Oberengstringen
Coordinates47.40567, 8.46174
Websiteequinix.com/locations/switzerland-colocation/zurich-data-centers/zh5

Power and grid

Nearest high-voltage substationUnterwerk Schlieren, 110 kV, 2.2 km away (Axpo/EKZ)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUnterwerk Regensdorf, 220 kV, 5.3 km away
HV substations within 10 km28
Power plants within 50 km6.1 GW in 57 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity39 g CO₂ per kWh (Switzerland, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 52.3%, nuclear 29.9%, solar 12.1%, oil and other fossil 1.9%, bioenergy 1.6%. Clean power: 97.7%

Climate and water

Average temperature9.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature33.5 °C (2001 to 2025)
Cooling degree days117 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.4 kWh per m² per day
Wind at 50 m4.3 m/s average
Water stress todayLow (<10%) (Switzerland)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Equinix ZH5 - Zurich, South use?

We estimate the facility power at about 7.2 MW. Estimate from building footprint, low confidence.

How close is Equinix ZH5 - Zurich, South to the power grid?

The nearest high-voltage substation in OpenStreetMap is Unterwerk Schlieren (110 kV), about 2.2 km away.

How clean is the power for Equinix ZH5 - Zurich, South?

The grid in Switzerland emits about 39 g CO₂ per kWh (2025). Largest sources: hydro 52.3%, nuclear 29.9%, solar 12.1%.

Who operates Equinix ZH5 - Zurich, South?

Equinix.

Data centers near Zurich

More Equinix data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.