Green Datacenter ZRH3 (fka: Green Schlieren)
Green Datacenter ZRH3 (fka: Green Schlieren) is an operational data center operated by Green Datacenter in Schlieren, Switzerland. Our footprint estimate of its power is about 0.8 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Green Datacenter |
| Facility power | 0.8 MW (range 0.4 MW to 1.3 MW) Estimate from building footprint, low confidence. Footprint estimate: about 678 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 340 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 7 networks, 1 internet exchanges PeeringDB. |
| Also known as | Green Datacenter Zurich City (Schlieren) |
| Address | Unterrohrstrasse 4 |
| Coordinates | 47.40362, 8.43789 |
| Website | green.ch |
Power and grid
| Nearest high-voltage substation | Unterwerk Schlieren, 110 kV, 400 m away (Axpo/EKZ) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unterwerk Spreitenbach, 220 kV, 5.1 km away |
| HV substations within 10 km | 25 |
| Power plants within 50 km | 6.2 GW in 58 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 39 g CO₂ per kWh (Switzerland, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.3%, nuclear 29.9%, solar 12.1%, oil and other fossil 1.9%, bioenergy 1.6%. Clean power: 97.7% |
Climate and water
| Average temperature | 9.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 33.5 °C (2001 to 2025) |
| Cooling degree days | 117 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.4 kWh per m² per day |
| Wind at 50 m | 4.3 m/s average |
| Water stress today | Low (<10%) (Switzerland) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Green Datacenter ZRH3 (fka: Green Schlieren) use?
We estimate the facility power at about 0.8 MW. Estimate from building footprint, low confidence.
How close is Green Datacenter ZRH3 (fka: Green Schlieren) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Unterwerk Schlieren (110 kV), about 400 m away.
How clean is the power for Green Datacenter ZRH3 (fka: Green Schlieren)?
The grid in Switzerland emits about 39 g CO₂ per kWh (2025). Largest sources: hydro 52.3%, nuclear 29.9%, solar 12.1%.
Who operates Green Datacenter ZRH3 (fka: Green Schlieren)?
Green Datacenter.
Data centers near Schlieren
- Equinix ZH5 - Zurich, South 1.8 km · 7.2 MW
- Templus DC Zurich ZRH01 2.9 km
- FSIT Dietikon CH-DIE001 3.6 km
- Data center in Zürich 4.8 km · 5.9 MW
- colozueri.ch Zurich 4.9 km
- Rechenzentrum Albis 5.2 km · 4.6 MW
- Equinix ZH2 - Zurich 6.4 km
- aspectra Zürich 7.8 km
More Green Datacenter data centers
- Green Datacenter ZRH1 (fka: Green Lupfig) Switzerland
- Green Datacenter ZRH2 (fka: Green Dielsdorf) Switzerland
- Green Datacenter ZRH4 (fka: Green Glattbrugg) Switzerland
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.