Google Leesburg Building 3

Google Leesburg Building 3 is an operational data center in Leesburg, United States. Our footprint estimate of its power is about 33 MW. Likely chips: Google TPU (plus NVIDIA GPUs for cloud customers) (guess).

Key facts

StatusOperational
Facility power33 MW (range 16 MW to 52 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 27,115 m² building outline x 1 floor(s) x 1.2 kW/m².
AI chipsGoogle TPU (plus NVIDIA GPUs for cloud customers)
Guess from the operator, not confirmed. Google runs most of its AI work on its own TPU chips.
GPU capacity if all AIabout 14,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressGoose Landing Lane 20480, 20175, Leesburg
Coordinates39.05104, -77.53480

Power and grid

UtilityNorthern Virginia Elec Coop (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineDominion Transmission Co, interstate pipeline, 800 m away
US Energy Information Administration pipeline map. Straight-line distance.
Grid carbon intensity357 g CO₂ per kWh (Virginia, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39%
Industrial power priceUSD 0.100 per kWh (Virginia, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature12.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature40.7 °C (2001 to 2025)
Cooling degree days729 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.98 kWh per m² per day
Wind at 50 m5.3 m/s average
Water stress todayMedium - High (20-40%) (Virginia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Google Leesburg Building 3 use?

We estimate the facility power at about 33 MW. Estimate from building footprint, low confidence.

What chips does Google Leesburg Building 3 use?

No chips are reported. Based on the operator, the likely chips are Google TPU (plus NVIDIA GPUs for cloud customers).

How clean is the power for Google Leesburg Building 3?

The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.