Google Leesburg Building 3
Google Leesburg Building 3 is an operational data center in Leesburg, United States. Our footprint estimate of its power is about 33 MW. Likely chips: Google TPU (plus NVIDIA GPUs for cloud customers) (guess).
Key facts
| Status | Operational |
|---|---|
| Facility power | 33 MW (range 16 MW to 52 MW) Estimate from building footprint, low confidence. Footprint estimate: about 27,115 m² building outline x 1 floor(s) x 1.2 kW/m². |
| AI chips | Google TPU (plus NVIDIA GPUs for cloud customers) Guess from the operator, not confirmed. Google runs most of its AI work on its own TPU chips. |
| GPU capacity if all AI | about 14,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Goose Landing Lane 20480, 20175, Leesburg |
| Coordinates | 39.05104, -77.53480 |
Power and grid
| Utility | Northern Virginia Elec Coop (cooperative) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PJM |
| Nearest gas pipeline | Dominion Transmission Co, interstate pipeline, 800 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.7 °C (2001 to 2025) |
| Cooling degree days | 729 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.98 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Google Leesburg Building 3 use?
We estimate the facility power at about 33 MW. Estimate from building footprint, low confidence.
What chips does Google Leesburg Building 3 use?
No chips are reported. Based on the operator, the likely chips are Google TPU (plus NVIDIA GPUs for cloud customers).
How clean is the power for Google Leesburg Building 3?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Data centers near Leesburg
- Stonewall Creek Business Park 403 m · 15 MW
- True North Data Centers 852 m · 81 MW
- 42254 THUNDERBALL DR 987 m · 34 MW
- Amazon IAD-668 1.2 km · 29 MW
- Microsoft Leesburg Building 5 2.6 km · 15 MW
- Microsoft Leesburg Building 4 3.0 km · 26 MW
- Microsoft Leesburg Building 1 3.7 km · 31 MW
- Vantage VA3 3.9 km · 44 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.