42254 THUNDERBALL DR
42254 THUNDERBALL DR is an operational data center operated by True North Data Solutions in Leesburg, United States. Our footprint estimate of its power is about 34 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | True North Data Solutions |
| Facility power | 34 MW (range 17 MW to 55 MW) Estimate from building footprint, low confidence. Footprint estimate: about 28,508 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 15,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | 42310 THUNDERBALL DR · 42255 THUNDERBALL DR |
| Address | Thunderball Drive 42254, 20175, Leesburg |
| Coordinates | 39.04350, -77.54084 |
Power and grid
| Nearest high-voltage substation | Thunderball Substation, 230 kV, 300 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 39 |
| Utility | Northern Virginia Elec Coop (cooperative) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 900 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 1.6 GW in 30 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.7 °C (2001 to 2025) |
| Cooling degree days | 729 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.98 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does 42254 THUNDERBALL DR use?
We estimate the facility power at about 34 MW. Estimate from building footprint, low confidence.
How close is 42254 THUNDERBALL DR to the power grid?
The nearest high-voltage substation in OpenStreetMap is Thunderball Substation (230 kV), about 300 m away. The local utility is Northern Virginia Elec Coop, in the PJM balancing area.
How clean is the power for 42254 THUNDERBALL DR?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Who operates 42254 THUNDERBALL DR?
True North Data Solutions.
Data centers near Leesburg
- True North Data Centers 309 m · 81 MW
- Stonewall Creek Business Park 895 m · 15 MW
- Google Leesburg Building 3 987 m · 33 MW
- Amazon IAD-668 1.5 km · 29 MW
- Microsoft Leesburg Building 5 2.9 km · 15 MW
- Microsoft Leesburg Building 4 3.3 km · 26 MW
- Microsoft Leesburg Building 1 4.0 km · 31 MW
- NFDG Andromeda 4.6 km · 5.8 MW
More True North Data Solutions data centers
- True North Data Centers United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.