NFDG Andromeda
NFDG Andromeda is an operational AI data center operated by Nat Friedman and Daniel Gross in Ashburn, United States. Its power is about 5.8 MW. Epoch AI estimates about 3,874 H100-equivalent AI chips (NVIDIA H100 SXM5 80GB, NVIDIA A100 SXM4 40 GB).
Key facts
| Status | Operational |
|---|---|
| Operator | Nat Friedman and Daniel Gross |
| Facility power | 5.8 MW Reported (Epoch AI or owner data) |
| AI compute | 3,874 H100-equivalents |
| AI chips | NVIDIA H100 SXM5 80GB, NVIDIA A100 SXM4 40 GB Reported (Epoch AI or owner data) |
| Chip count | 4,400 Largest reported cluster at this site (Epoch AI). |
| GPU capacity if all AI | about 2,500 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Ashburn, Virginia |
| Coordinates | 39.04355, -77.48745 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 230 kV, 1.3 km away (Dominion Energy) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 43 |
| Utility | Virginia Electric & Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Dominion Transmission Co, interstate pipeline, 2.4 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 1.6 GW in 39 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.7 °C (2001 to 2025) |
| Cooling degree days | 729 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.98 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
GPU clusters at this site
| Cluster | Chips | Count | Power | Since |
|---|---|---|---|---|
| NFDG Andromeda Phase 1 | NVIDIA H100 SXM5 80GB | 2,512 | 3.6 MW | 2023-06-13 |
| Ahrefs Yep1 | NVIDIA H100 SXM5 80GB | 504 | 0.7 MW | 2024-06-01 |
| NFDG Andromeda Phase 2 | NVIDIA H100 SXM5 80GB + NVIDIA A100 SXM4 40 GB | 4,400 | 5.8 MW | 2024-07-15 |
Source: Epoch AI GPU Clusters.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does NFDG Andromeda use?
Public data puts the facility power at about 5.8 MW. Reported (Epoch AI or owner data).
What chips does NFDG Andromeda use?
Reported chips: NVIDIA H100 SXM5 80GB, NVIDIA A100 SXM4 40 GB.
How close is NFDG Andromeda to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (230 kV), about 1.3 km away. The local utility is Virginia Electric & Power Co, in the PJM balancing area.
How clean is the power for NFDG Andromeda?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Who operates NFDG Andromeda?
Nat Friedman and Daniel Gross.
Data centers near Ashburn
- NTT VA8 2.9 km · 16 MW
- Amazon Web Services 3.0 km · 77 MW
- RagingWire VA3 - NTT 3.1 km
- DataBank Ashburn (IAD1) 3.1 km · 13 MW
- NTT Ashburn Campus 3.1 km · 21 MW
- Sabey Intergate.Ashburn 3.2 km · 30 MW
- Equinix DC3 3.3 km · 7 MW
- Amazon IAD-114 3.3 km · 61 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.