Data Center Directory

Amazon IAD-114

Amazon IAD-114 is an operational data center operated by Amazon Web Services in Ashburn, United States. Its power is about 61 MW. Likely chips: AWS Trainium and NVIDIA GPUs (guess).

Key facts

StatusOperational
OperatorAmazon Web Services
Facility power61 MW
Derived from a tagged IT power value. IT power tag in OpenStreetMap
IT power47 MW
AI chipsAWS Trainium and NVIDIA GPUs
Guess from the operator, not confirmed. AWS deploys its own Trainium chips next to NVIDIA GPUs.
GPU capacity if all AIabout 26,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asAmazon IAD-115
AddressLoudoun County Parkway 20945, 20147, Ashburn
Opened2019
Coordinates39.03549, -77.45070

Power and grid

Nearest high-voltage substationUnnamed substation, 230 kV, 1.2 km away (Virginia Electric & Power Company)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km44
UtilityVirginia Electric & Power Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineColumbia Gas Trans Co, interstate pipeline, 5.2 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km1.6 GW in 41 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity357 g CO₂ per kWh (Virginia, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39%
Industrial power priceUSD 0.100 per kWh (Virginia, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature12.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature40.7 °C (2001 to 2025)
Cooling degree days729 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.98 kWh per m² per day
Wind at 50 m5.3 m/s average
Water stress todayMedium - High (20-40%) (Virginia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Amazon IAD-114 use?

Public data puts the facility power at about 61 MW. Derived from a tagged IT power value.

What chips does Amazon IAD-114 use?

No chips are reported. Based on the operator, the likely chips are AWS Trainium and NVIDIA GPUs.

How close is Amazon IAD-114 to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (230 kV), about 1.2 km away. The local utility is Virginia Electric & Power Co, in the PJM balancing area.

How clean is the power for Amazon IAD-114?

The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.

Who operates Amazon IAD-114?

Amazon Web Services.

Data centers near Ashburn

More Amazon Web Services data centers

Sources

Correct this page or get the data