Amazon IAD-114
Amazon IAD-114 is an operational data center operated by Amazon Web Services in Ashburn, United States. Its power is about 61 MW. Likely chips: AWS Trainium and NVIDIA GPUs (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Amazon Web Services |
| Facility power | 61 MW Derived from a tagged IT power value. IT power tag in OpenStreetMap |
| IT power | 47 MW |
| AI chips | AWS Trainium and NVIDIA GPUs Guess from the operator, not confirmed. AWS deploys its own Trainium chips next to NVIDIA GPUs. |
| GPU capacity if all AI | about 26,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Amazon IAD-115 |
| Address | Loudoun County Parkway 20945, 20147, Ashburn |
| Opened | 2019 |
| Coordinates | 39.03549, -77.45070 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 230 kV, 1.2 km away (Virginia Electric & Power Company) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 44 |
| Utility | Virginia Electric & Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 5.2 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 1.6 GW in 41 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.7 °C (2001 to 2025) |
| Cooling degree days | 729 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.98 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Amazon IAD-114 use?
Public data puts the facility power at about 61 MW. Derived from a tagged IT power value.
What chips does Amazon IAD-114 use?
No chips are reported. Based on the operator, the likely chips are AWS Trainium and NVIDIA GPUs.
How close is Amazon IAD-114 to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (230 kV), about 1.2 km away. The local utility is Virginia Electric & Power Co, in the PJM balancing area.
How clean is the power for Amazon IAD-114?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Who operates Amazon IAD-114?
Amazon Web Services.
Data centers near Ashburn
- Amazon Web Services Datacenter Complex 1.0 km · 49 MW
- Amazon Web Services 1.0 km · 77 MW
- Equinix DC16 1.3 km · 67 MW
- RagingWire VA2 - NTT 1.3 km · 18 MW
- Equinix DC12 1.4 km · 24 MW
- RagingWire VA1 - NTT 1.5 km · 16 MW
- Centersquare Northern Virginia (IAD4) 1.5 km · 24 MW
- Visa Operations Center East 1.5 km · 45 MW
More Amazon Web Services data centers
- Anthropic-Amazon New Carlisle United States
- Amazon Ridgeland United States
- Amazon Madison Mega Site United States
- AWS New Albany United States
- AWS Canton Data Center United States
- AWS Berwick United States
- AWS Ridgeland Data Center United States
- AWS Umatilla Data Center United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.