Visa Operations Center East
Visa Operations Center East is an operational data center operated by Visa in Ashburn, United States. Our footprint estimate of its power is about 45 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Visa |
| Facility power | 45 MW (range 22 MW to 72 MW) Estimate from building footprint, low confidence. Footprint estimate: about 37,365 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 19,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Russell Branch Parkway 45005, 20147, Ashburn |
| Coordinates | 39.04877, -77.44540 |
Power and grid
| Nearest high-voltage substation | DTC substation, 230 kV, 1.9 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 39 |
| Utility | Virginia Electric & Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 4.9 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 1.6 GW in 43 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.7 °C (2001 to 2025) |
| Cooling degree days | 729 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.98 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Visa Operations Center East use?
We estimate the facility power at about 45 MW. Estimate from building footprint, low confidence.
How close is Visa Operations Center East to the power grid?
The nearest high-voltage substation in OpenStreetMap is DTC substation (230 kV), about 1.9 km away. The local utility is Virginia Electric & Power Co, in the PJM balancing area.
How clean is the power for Visa Operations Center East?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Who operates Visa Operations Center East?
Visa.
Data centers near Ashburn
- Amazon IAD-114 1.5 km · 61 MW
- Amazon IAD-163 2.3 km · 18 MW
- Amazon Web Services 2.5 km · 77 MW
- CyrusOne Sterling V 2.5 km · 10 MW
- Amazon Web Services Datacenter Complex 2.6 km · 49 MW
- Amazon IAD-174 2.7 km · 28 MW
- Equinix DC16 2.8 km · 67 MW
- RagingWire VA2 - NTT 2.9 km · 18 MW
More Visa data centers
- VISA United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.