VISA
VISA is an operational data center operated by VISA in Vernon Hills, United States. Our footprint estimate of its power is about 5.9 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | VISA |
| Facility power | 5.9 MW (range 3 MW to 9.5 MW) Estimate from building footprint, low confidence. Footprint estimate: about 4,944 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,500 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Corporate Woods Parkway 475, 60061, Vernon Hills |
| Coordinates | 42.21678, -87.95293 |
Power and grid
| Utility | Commonwealth Edison Co (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PJM |
| Nearest gas pipeline | Northern Illinois Gas Co, intrastate pipeline, 10.6 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 247 g CO₂ per kWh (Illinois, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 49.9%, gas 16.6%, coal 15.8%, wind 12.8%, solar 4.5%. Clean power: 67.3% |
| Industrial power price | USD 0.113 per kWh (Illinois, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 9.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.5 °C (2001 to 2025) |
| Cooling degree days | 465 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.67 kWh per m² per day |
| Wind at 50 m | 6.8 m/s average |
| Water stress today | Medium - High (20-40%) (Illinois) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does VISA use?
We estimate the facility power at about 5.9 MW. Estimate from building footprint, low confidence.
How clean is the power for VISA?
The grid in Illinois emits about 247 g CO₂ per kWh (2025). Largest sources: nuclear 49.9%, gas 16.6%, coal 15.8%.
Who operates VISA?
VISA.
Data centers near Vernon Hills
- NETRIX - BBN 5.9 km
- DataBank Chicago (ORD3) 15.6 km
- NETRIX - MTP 15.7 km
- GigeNET CHI3 19.7 km
- Aligned Data Center 20.4 km · 40 MW
- Microsoft CHI12 Data Center 21.5 km · 13 MW
- T5@Chicago 21.5 km · 14 MW
- Microsoft Data Center - Hoffman Estates 21.5 km · 18 MW
More VISA data centers
- Visa Operations Center East United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.