Data Center Directory

Microsoft CHI12 Data Center

Microsoft CHI12 Data Center is a data center under construction operated by Microsoft in Elk Grove Village, United States. Our footprint estimate of its power is about 13 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).

Key facts

StatusUnder construction
OperatorMicrosoft
Facility power13 MW (range 6.3 MW to 20 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 10,516 m² building outline x 1 floor(s) x 1.2 kW/m².
AI chipsNVIDIA GPUs (some Microsoft Maia)
Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips.
GPU capacity if all AIabout 5,600 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asMicrosoft CHI13 Data Center · Microsoft CHI11 Data Center
AddressInnovation Drive, 60007, Elk Grove Village
Coordinates42.02420, -87.97156

Power and grid

Nearest high-voltage substationUnnamed substation, 138 kV, 200 m away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationComEd Itasca 138kV-345kV Substation, 345 kV, 5.3 km away
HV substations within 10 km13
UtilityCommonwealth Edison Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineNorthern Illinois Gas Co, intrastate pipeline, 1.2 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km2.7 GW in 28 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity247 g CO₂ per kWh (Illinois, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 49.9%, gas 16.6%, coal 15.8%, wind 12.8%, solar 4.5%. Clean power: 67.3%
Industrial power priceUSD 0.113 per kWh (Illinois, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature9.5 °C
NASA POWER, average of 2001 to 2025.
Highest temperature40.5 °C (2001 to 2025)
Cooling degree days465 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.67 kWh per m² per day
Wind at 50 m6.8 m/s average
Water stress todayMedium - High (20-40%) (Illinois)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Microsoft CHI12 Data Center use?

We estimate the facility power at about 13 MW. Estimate from building footprint, low confidence.

What chips does Microsoft CHI12 Data Center use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).

How close is Microsoft CHI12 Data Center to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (138 kV), about 200 m away. The local utility is Commonwealth Edison Co, in the PJM balancing area.

How clean is the power for Microsoft CHI12 Data Center?

The grid in Illinois emits about 247 g CO₂ per kWh (2025). Largest sources: nuclear 49.9%, gas 16.6%, coal 15.8%.

Who operates Microsoft CHI12 Data Center?

Microsoft.

Data centers near Elk Grove Village

More Microsoft data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.