NETRIX - MTP
NETRIX - MTP is an operational data center operated by Netrix in Mount Prospect, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Netrix |
| Networks | 3 networks PeeringDB. |
| Also known as | Apotech |
| Address | 1331 E Business Center Drive |
| Coordinates | 42.07816, -87.91563 |
| Website | netrixllc.com |
Power and grid
| Utility | Commonwealth Edison Co (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PJM |
| Nearest gas pipeline | Northern Illinois Gas Co, intrastate pipeline, 1.8 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 247 g CO₂ per kWh (Illinois, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 49.9%, gas 16.6%, coal 15.8%, wind 12.8%, solar 4.5%. Clean power: 67.3% |
| Industrial power price | USD 0.113 per kWh (Illinois, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 9.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.5 °C (2001 to 2025) |
| Cooling degree days | 465 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.67 kWh per m² per day |
| Wind at 50 m | 6.8 m/s average |
| Water stress today | Medium - High (20-40%) (Illinois) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for NETRIX - MTP?
The grid in Illinois emits about 247 g CO₂ per kWh (2025). Largest sources: nuclear 49.9%, gas 16.6%, coal 15.8%.
Who operates NETRIX - MTP?
Netrix.
Data centers near Mount Prospect
- DataBank Chicago (ORD3) 653 m
- GigeNET CHI3 6.5 km
- Prime Data Centers 7.2 km · 11 MW
- Aligned Data Center 7.4 km · 40 MW
- Microsoft CHI12 Data Center 7.6 km · 13 MW
- T5@Chicago 7.7 km · 14 MW
- Stream Data Centers 8.1 km · 17 MW
- EdgeConnex Data Center 8.1 km · 7.1 MW
More Netrix data centers
- NETRIX - ALSIP United States
- NETRIX - BBN United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.