GrafiX Internet B.V. - Alphen
GrafiX Internet B.V. - Alphen is an operational data center operated by GrafiX Internet in Alphen aan den Rijn, Netherlands. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | GrafiX Internet |
| Networks | 1 networks PeeringDB. |
| Address | Handelsweg 8 |
| Coordinates | 52.13109, 4.64016 |
| Website | grafix.nl |
Power and grid
| Nearest high-voltage substation | 150 kV Alphen a/d Rijn, 150 kV, 500 m away (TenneT) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 380 kV, 6.6 km away |
| HV substations within 10 km | 5 |
| Power plants within 50 km | 11 GW in 73 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 254 g CO₂ per kWh (Netherlands, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 34.9%, wind 25%, solar 21.1%, coal 7.1%, bioenergy 5.1%. Clean power: 54.2% |
| Industrial power price | EUR 0.139 per kWh (Netherlands, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 33.5 °C (2001 to 2025) |
| Cooling degree days | 62 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.97 kWh per m² per day |
| Wind at 50 m | 7.4 m/s average |
| Water stress today | Low - Medium (10-20%) (Netherlands) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is GrafiX Internet B.V. - Alphen to the power grid?
The nearest high-voltage substation in OpenStreetMap is 150 kV Alphen a/d Rijn (150 kV), about 500 m away.
How clean is the power for GrafiX Internet B.V. - Alphen?
The grid in Netherlands emits about 254 g CO₂ per kWh (2025). Largest sources: gas 34.9%, wind 25%, solar 21.1%.
Who operates GrafiX Internet B.V. - Alphen?
GrafiX Internet.
Data centers near Alphen aan den Rijn
- Cellnex Datacenter Alphen aan den Rijn 780 m
- ColoCenter Zoetermeer 14.7 km
- NorthC Aalsmeer 17.0 km · 12 MW
- Digital Realty AMS8 17.6 km
- Digital Realty AMS15 - Amsterdam 17.9 km
- Eurofiber Datacenter Amsterdam 1 18.0 km
- HostSlim 18.1 km · 22 MW
- Switch Datacenters AMS2 18.1 km
More GrafiX Internet data centers
- GrafiX Internet B.V. - Capelle Netherlands
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.