Switch Datacenters AMS2
Switch Datacenters AMS2 is an operational data center operated by Switch Datacenter in Woerden, Netherlands. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Switch Datacenter |
| Networks | 3 networks PeeringDB. |
| Address | Polanerbaan 1 |
| Coordinates | 52.08180, 4.89282 |
| Website | switchdatacenters.com |
Power and grid
| Nearest high-voltage substation | 150 kV Breukelen Kortrijk, 150 kV, 10.9 km away (TenneT) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | 380 kV Breukelen Kortrijk, 380 kV, 10.9 km away |
| Power plants within 50 km | 7.0 GW in 84 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 254 g CO₂ per kWh (Netherlands, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 34.9%, wind 25%, solar 21.1%, coal 7.1%, bioenergy 5.1%. Clean power: 54.2% |
| Industrial power price | EUR 0.139 per kWh (Netherlands, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.8 °C (2001 to 2025) |
| Cooling degree days | 76 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.97 kWh per m² per day |
| Wind at 50 m | 7 m/s average |
| Water stress today | Low (<10%) (Utrecht) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Switch Datacenters AMS2 to the power grid?
The nearest high-voltage substation in OpenStreetMap is 150 kV Breukelen Kortrijk (150 kV), about 10.9 km away.
How clean is the power for Switch Datacenters AMS2?
The grid in Netherlands emits about 254 g CO₂ per kWh (2025). Largest sources: gas 34.9%, wind 25%, solar 21.1%.
Who operates Switch Datacenters AMS2?
Switch Datacenter.
Data centers near Woerden
- HostSlim 77 m · 22 MW
- Data center in De Meern 8.8 km
- Alticom - IJsselstein 13.9 km
- NorthC Nieuwegein 16.1 km
- Eurofiber Datacenter Utrecht 1 17.7 km · 3.4 MW
- Cellnex Datacenter Alphen aan den Rijn 17.9 km
- GrafiX Internet B.V. - Alphen 18.1 km
- NorthC Aalsmeer 21.4 km · 12 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.