HostSlim
HostSlim is an operational data center operated by HostSlim in Woerden, Netherlands. Our footprint estimate of its power is about 22 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | HostSlim |
| Facility power | 22 MW (range 11 MW to 35 MW) Estimate from building footprint, low confidence. Footprint estimate: about 3,604 m² building outline x 5 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 9,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Switch Datacenters AMS2 |
| Address | Polanerbaan 1, 3447 GN Woerden |
| Opened | 1999 |
| Coordinates | 52.08249, 4.89273 |
| Website | hostslim.eu |
Power and grid
| Grid carbon intensity | 254 g CO₂ per kWh (Netherlands, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 34.9%, wind 25%, solar 21.1%, coal 7.1%, bioenergy 5.1%. Clean power: 54.2% |
| Industrial power price | EUR 0.139 per kWh (Netherlands, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.8 °C (2001 to 2025) |
| Cooling degree days | 76 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.97 kWh per m² per day |
| Wind at 50 m | 7 m/s average |
| Water stress today | Low (<10%) (Utrecht) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does HostSlim use?
We estimate the facility power at about 22 MW. Estimate from building footprint, low confidence.
How clean is the power for HostSlim?
The grid in Netherlands emits about 254 g CO₂ per kWh (2025). Largest sources: gas 34.9%, wind 25%, solar 21.1%.
Who operates HostSlim?
HostSlim.
Data centers near Woerden
- Switch Datacenters AMS2 77 m
- Data center in De Meern 8.8 km
- Alticom - IJsselstein 14.0 km
- NorthC Nieuwegein 16.1 km
- Eurofiber Datacenter Utrecht 1 17.7 km · 3.4 MW
- Cellnex Datacenter Alphen aan den Rijn 17.9 km
- GrafiX Internet B.V. - Alphen 18.1 km
- NorthC Aalsmeer 21.3 km · 12 MW