Hasselt DC1
Hasselt DC1 is an operational data center operated by Connect4 in Hasselt, Belgium. Our footprint estimate of its power is about 1.4 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Connect4 |
| Facility power | 1.4 MW (range 0.7 MW to 2.2 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,153 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 3 networks, 1 internet exchanges PeeringDB. |
| Also known as | DC Hasselt 1 |
| Address | Veldstraat 101 |
| Coordinates | 50.93158, 5.30465 |
| Website | hasseltdc.be |
Power and grid
| Grid carbon intensity | 151 g CO₂ per kWh (Belgium, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | nuclear 33.5%, gas 20.8%, wind 18.6%, solar 14.5%, oil and other fossil 7.1%. Clean power: 72.1% |
| Industrial power price | EUR 0.133 per kWh (Belgium, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.3 °C (2001 to 2025) |
| Cooling degree days | 119 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.03 kWh per m² per day |
| Wind at 50 m | 6.7 m/s average |
| Water stress today | Extremely High (>80%) (Belgium) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Hasselt DC1 use?
We estimate the facility power at about 1.4 MW. Estimate from building footprint, low confidence.
How clean is the power for Hasselt DC1?
The grid in Belgium emits about 151 g CO₂ per kWh (2025). Largest sources: nuclear 33.5%, gas 20.8%, wind 18.6%.
Who operates Hasselt DC1?
Connect4.
Data centers near Hasselt
- Hasselt DC2 4.2 km · 7 MW
- ENGIE Cofely (Maastricht-Airport) 33.4 km
- EXA Edge DC Liege 34.8 km
- Penta Infra Geleen GLN01 37.1 km
- Unilogic Networks Datacenter Sittard 38.6 km
- WDC 39.1 km · 3.4 MW
- ETIX BelgiumDC #1 39.2 km
- Unix-Solutions DC Leuven 41.8 km
More Connect4 data centers
- Hasselt DC2 Belgium
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.