Data Center Directory

Hasselt DC2

Hasselt DC2 is an operational data center operated by Connect4 in Hasselt, Belgium. Our footprint estimate of its power is about 7 MW.

Key facts

StatusOperational
OperatorConnect4
Facility power7 MW (range 3.5 MW to 11 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 5,850 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 3,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks3 networks
PeeringDB.
Also known asDC Hasselt 2
AddressTrichterheideweg 2
Coordinates50.93829, 5.36360
Websitehasseltdc.be

Satellite view

Questions

How much power does Hasselt DC2 use?

We estimate the facility power at about 7 MW. Estimate from building footprint, low confidence.

Who operates Hasselt DC2?

Connect4.

Data centers near Hasselt

More Connect4 data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.