Hetzner Online NBG1 (Nuremberg)
Hetzner Online NBG1 (Nuremberg) is an operational data center operated by Hetzner Online in Nuremberg, Germany. Our footprint estimate of its power is about 6.2 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Hetzner Online |
| Facility power | 6.2 MW (range 2.5 MW to 16 MW) Estimate from building footprint, low confidence. Footprint estimate: about 51,989 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 2,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 51 networks, 4 internet exchanges PeeringDB. |
| Also known as | Hetzner Online GmbH |
| Address | Sigmundstr. 135, 90431 Nürnberg |
| Coordinates | 49.44951, 11.01538 |
| Website | hetzner.com |
Power and grid
| Nearest high-voltage substation | Umspannwerk Sigmundstraße, 110 kV, 200 m away (N-ERGIE Netz) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Umspannwerk Kriegenbrunn, 380 kV, 12.5 km away |
| HV substations within 10 km | 19 |
| Power plants within 50 km | 1.3 GW in 23 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 334 g CO₂ per kWh (Germany, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5% |
| Industrial power price | EUR 0.146 per kWh (Germany, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 8.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.4 °C (2001 to 2025) |
| Cooling degree days | 156 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.14 kWh per m² per day |
| Wind at 50 m | 5.9 m/s average |
| Water stress today | Medium - High (20-40%) (Germany) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Hetzner Online NBG1 (Nuremberg) use?
We estimate the facility power at about 6.2 MW. Estimate from building footprint, low confidence.
How close is Hetzner Online NBG1 (Nuremberg) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Umspannwerk Sigmundstraße (110 kV), about 200 m away.
How clean is the power for Hetzner Online NBG1 (Nuremberg)?
The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.
Who operates Hetzner Online NBG1 (Nuremberg)?
Hetzner Online.
Data centers near Nuremberg
- nLighten Nuremberg NUE1 518 m
- ScaleUp Datacenter NUE1 857 m
- euNetworks Colocation Nuernberg 1.8 km
- Deutschherrnkarree 3.5 km
- noris network datacenter.de NBG3 / NBG4 3.5 km
- ADESTIS Nürnberg NBG1 (Alte Dampfbäckerei) 5.6 km
- noris network datacenter.de NBG6 9.4 km · 10 MW
- NorthC Nürnberg 13.4 km
More Hetzner Online data centers
- Hetzner Online FSN1 (Falkenstein) Germany
- Hetzner Online HEL1 (Helsinki) Finland
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.