Data Center Directory

noris network datacenter.de NBG3 / NBG4

noris network datacenter.de NBG3 / NBG4 is an operational data center operated by noris network in Nuremberg, Germany. No power figure is public for this site yet.

Key facts

StatusOperational
Operatornoris network
Networks18 networks, 2 internet exchanges
PeeringDB.
Also known asCore-Backbone NBG1 · Core-Backbone NBG2 · Core-Backbone NBG3 · Rechenzentrum Nürnberg Zentrum
AddressDeutschherrnstraße 15-19
Coordinates49.45341, 11.06364
Websitenoris.net

Power and grid

Nearest high-voltage substationUmspannwerk Am Plärrer, 110 kV, 500 m away (N-ERGIE Netz)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUmspannwerk Kriegenbrunn, 380 kV, 13.4 km away
HV substations within 10 km21
Power plants within 50 km1.4 GW in 26 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity334 g CO₂ per kWh (Germany, 2025)
Average of all power made in the area. Ember.
Grid power mixwind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5%
Industrial power priceEUR 0.146 per kWh (Germany, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature8.9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38.4 °C (2001 to 2025)
Cooling degree days156 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.14 kWh per m² per day
Wind at 50 m5.9 m/s average
Water stress todayMedium - High (20-40%) (Germany)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How close is noris network datacenter.de NBG3 / NBG4 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Umspannwerk Am Plärrer (110 kV), about 500 m away.

How clean is the power for noris network datacenter.de NBG3 / NBG4?

The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.

Who operates noris network datacenter.de NBG3 / NBG4?

noris network.

Data centers near Nuremberg

More noris network data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.