noris network datacenter.de MUC5
noris network datacenter.de MUC5 is an operational data center operated by noris network in Aschheim, Germany. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | noris network |
| Networks | 12 networks, 1 internet exchanges PeeringDB. |
| Address | Klausnerstraße 30 |
| Coordinates | 48.16215, 11.73260 |
| Website | datacenter.de |
Power and grid
| Nearest high-voltage substation | Landsham, 110 kV, 3.7 km away (Bayernwerk Netz) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Hauptumspannwerk Föhring, 380 kV, 7.2 km away |
| HV substations within 10 km | 16 |
| Power plants within 50 km | 3.0 GW in 63 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 334 g CO₂ per kWh (Germany, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5% |
| Industrial power price | EUR 0.146 per kWh (Germany, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 8.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.2 °C (2001 to 2025) |
| Cooling degree days | 108 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.25 kWh per m² per day |
| Wind at 50 m | 4.5 m/s average |
| Water stress today | Medium - High (20-40%) (Germany) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is noris network datacenter.de MUC5 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Landsham (110 kV), about 3.7 km away.
How clean is the power for noris network datacenter.de MUC5?
The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.
Who operates noris network datacenter.de MUC5?
noris network.
Data centers near Aschheim
- noris Munich MUC5 389 m · 5.5 MW
- NTT Munich 1 Data Center (MUC1) 1.8 km
- Portus MUC1 2.7 km
- Equinix MU4 - Munich, Dornach 4.1 km · 1.9 MW
- NorthC Munich 2 5.9 km · 7.3 MW
- WIIT Datacenter MUC8 6.0 km
- Data center in Unterföhring 7.5 km · 2.3 MW
- Telekom Data-Center 10.0 km · 29 MW
More noris network data centers
- noris network datacenter.de NBG6 Germany
- noris network FRA1 Germany
- noris network datacenter.de HOF1 Germany
- noris network datacenter.de NBG3 / NBG4 Germany
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.