Portus MUC1
Portus MUC1 is an operational data center operated by Portus Data Centers in Kirchheim, Germany. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Portus Data Centers |
| Networks | 7 networks, 1 internet exchanges PeeringDB. |
| Address | Marsstrasse 5 |
| Coordinates | 48.15853, 11.76882 |
| Website | portusdatacenters.com |
Power and grid
| Nearest high-voltage substation | Landsham, 110 kV, 2.1 km away (Bayernwerk Netz) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Umspannwerk Neufinsing, 220 kV, 7.7 km away |
| HV substations within 10 km | 12 |
| Power plants within 50 km | 3.0 GW in 63 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 334 g CO₂ per kWh (Germany, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5% |
| Industrial power price | EUR 0.146 per kWh (Germany, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 8.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.4 °C (2001 to 2025) |
| Cooling degree days | 105 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.25 kWh per m² per day |
| Wind at 50 m | 4.2 m/s average |
| Water stress today | Medium - High (20-40%) (Germany) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Portus MUC1 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Landsham (110 kV), about 2.1 km away.
How clean is the power for Portus MUC1?
The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.
Who operates Portus MUC1?
Portus Data Centers.
Data centers near Kirchheim
- NTT Munich 1 Data Center (MUC1) 1.8 km
- noris Munich MUC5 2.3 km · 5.5 MW
- noris network datacenter.de MUC5 2.7 km
- Equinix MU4 - Munich, Dornach 6.6 km · 1.9 MW
- WIIT Datacenter MUC8 6.7 km
- NorthC Munich 2 8.3 km · 7.3 MW
- Data center in Unterföhring 9.9 km · 2.3 MW
- Telekom Data-Center 12.7 km · 29 MW
More Portus Data Centers data centers
- Portus/IPHH HH3 (Wendenstrasse 251) Germany
- Portus LUX1 Luxembourg
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.