Equinix MU4 - Munich, Dornach is a data center under construction operated by Equinix in Aschheim, Germany. Our footprint estimate of its power is about 1.9 MW.
Key facts
| Status | Under construction |
|---|---|
| Operator | Equinix |
| Facility power | 1.9 MW (range 0.8 MW to 4.7 MW) Estimate from building footprint, low confidence. Footprint estimate: about 15,639 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 810 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 13 networks, 1 internet exchanges PeeringDB. |
| Also known as | MU4 |
| Address | Dywidagstr. 10, 85609 Aschheim |
| Coordinates | 48.14639, 11.68239 |
| Website | equinix.com/data-centers/europe-colocation/germany-colocation/munich-data-centers/mu4 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 110 kV, 1.6 km away (Stadtwerke München) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Hauptumspannwerk Föhring, 380 kV, 4.8 km away |
| HV substations within 10 km | 24 |
| Power plants within 50 km | 2.9 GW in 63 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 334 g CO₂ per kWh (Germany, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5% |
| Industrial power price | EUR 0.146 per kWh (Germany, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 8.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.2 °C (2001 to 2025) |
| Cooling degree days | 108 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.25 kWh per m² per day |
| Wind at 50 m | 4.5 m/s average |
| Water stress today | Medium - High (20-40%) (Germany) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Equinix MU4 - Munich, Dornach use?
We estimate the facility power at about 1.9 MW. Estimate from building footprint, low confidence.
How close is Equinix MU4 - Munich, Dornach to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (110 kV), about 1.6 km away.
How clean is the power for Equinix MU4 - Munich, Dornach?
The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.
Who operates Equinix MU4 - Munich, Dornach?
Equinix.
Data centers near Aschheim
- NorthC Munich 2 1.9 km · 7.3 MW
- noris network datacenter.de MUC5 4.1 km
- noris Munich MUC5 4.4 km · 5.5 MW
- NTT Munich 1 Data Center (MUC1) 4.9 km
- WIIT Datacenter MUC8 4.9 km
- Telekom Data-Center 6.3 km · 29 MW
- Portus MUC1 6.6 km
- NorthC München 1 6.7 km
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix CH3 - Elk Grove United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.