NorthC München 1
NorthC München 1 is an operational data center operated by NorthC in Munich, Germany. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | NorthC |
| Coordinates | 48.11915, 11.60218 |
| Website | northcdatacenters.com/de/northc-datacenters/muenchen |
Power and grid
| Grid carbon intensity | 334 g CO₂ per kWh (Germany, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | wind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5% |
| Industrial power price | EUR 0.146 per kWh (Germany, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 8.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.2 °C (2001 to 2025) |
| Cooling degree days | 108 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.25 kWh per m² per day |
| Wind at 50 m | 4.5 m/s average |
| Water stress today | Medium - High (20-40%) (Germany) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for NorthC München 1?
The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.
Who operates NorthC München 1?
NorthC.
Data centers near Munich
- NorthC Munich 1 185 m
- Telekom Data-Center 3.6 km · 29 MW
- Equinix MU1/MU3 - Munich 4.3 km
- NorthC Munich 2 4.9 km · 7.3 MW
- Siemens EAGLE Data Center 6.0 km · 2 MW
- EdgeConneX Munich (EDCMUC01) 6.1 km
- Equinix MU4 - Munich, Dornach 6.7 km · 1.9 MW
- euNetworks Colocation Muenchen 1 6.9 km
More NorthC data centers
- NorthC Frankfurt 3 Germany
- NorthC Datacenter Delft Netherlands
- NorthC Datacenter Oude Meer Netherlands
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.