Siemens EAGLE Data Center
Siemens EAGLE Data Center is an operational data center operated by Siemens in Munich, Germany. Our footprint estimate of its power is about 2 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Siemens |
| Facility power | 2 MW (range 1 MW to 3.1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,639 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 850 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 48.09491, 11.53014 |
| Website | blog.siemens.com/2020/07/green-it-in-the-siemens-eagle-data-center |
Power and grid
| Grid carbon intensity | 334 g CO₂ per kWh (Germany, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | wind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5% |
| Industrial power price | EUR 0.146 per kWh (Germany, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 8.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.2 °C (2001 to 2025) |
| Cooling degree days | 108 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.25 kWh per m² per day |
| Wind at 50 m | 4.5 m/s average |
| Water stress today | Medium - High (20-40%) (Germany) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Siemens EAGLE Data Center use?
We estimate the facility power at about 2 MW. Estimate from building footprint, low confidence.
How clean is the power for Siemens EAGLE Data Center?
The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.
Who operates Siemens EAGLE Data Center?
Siemens.
Data centers near Munich
- Bundesnachrichtendienst Pullach Rechenzentrum 3.5 km · 2.5 MW
- Online Solution 4.1 km
- EdgeConneX Munich (EDCMUC01) 5.0 km
- Equinix MU1/MU3 - Munich 5.7 km
- NorthC Munich 1 5.9 km
- NorthC München 1 6.0 km
- euNetworks Colocation Muenchen 1 6.1 km
- Telekom Data-Center 8.1 km · 29 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.