Bundesnachrichtendienst Pullach Rechenzentrum

Bundesnachrichtendienst Pullach Rechenzentrum is an operational data center operated by Bundesnachrichtendienst in Pullach im Isartal, Germany. Our footprint estimate of its power is about 2.5 MW.

Key facts

StatusOperational
OperatorBundesnachrichtendienst
Facility power2.5 MW (range 1.2 MW to 4 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 2,075 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates48.06392, 11.53337

Power and grid

Nearest high-voltage substationUmspannwerk Siemens Hofmannstraße, 110 kV, 3.5 km away (Stadtwerke München)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationHauptumspannwerk Menzing, 380 kV, 13.8 km away
HV substations within 10 km22
Power plants within 50 km2.7 GW in 54 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity334 g CO₂ per kWh (Germany, 2025)
Average of all power made in the area. Ember.
Grid power mixwind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5%
Industrial power priceEUR 0.146 per kWh (Germany, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature8.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature36.2 °C (2001 to 2025)
Cooling degree days108 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.25 kWh per m² per day
Wind at 50 m4.5 m/s average
Water stress todayMedium - High (20-40%) (Germany)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Bundesnachrichtendienst Pullach Rechenzentrum use?

We estimate the facility power at about 2.5 MW. Estimate from building footprint, low confidence.

How close is Bundesnachrichtendienst Pullach Rechenzentrum to the power grid?

The nearest high-voltage substation in OpenStreetMap is Umspannwerk Siemens Hofmannstraße (110 kV), about 3.5 km away.

How clean is the power for Bundesnachrichtendienst Pullach Rechenzentrum?

The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.

Who operates Bundesnachrichtendienst Pullach Rechenzentrum?

Bundesnachrichtendienst.

Data centers near Pullach im Isartal

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.