Equinix MU1/MU3 - Munich
Equinix MU1/MU3 - Munich is an operational data center operated by Equinix in Munich, Germany. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Equinix |
| Networks | 60 networks, 2 internet exchanges PeeringDB. |
| Also known as | Global Crossing Munich · Equinix MU1 |
| Address | Seidlstrasse 3 |
| Coordinates | 48.14306, 11.55584 |
| Website | equinix.com/locations/germany-colocation/munich-data-centers |
Power and grid
| Nearest high-voltage substation | Umspannwerk Seidlstraße, 110 kV, 200 m away (Stadtwerke München) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Hauptumspannwerk Föhring, 380 kV, 7.4 km away |
| HV substations within 10 km | 34 |
| Power plants within 50 km | 2.8 GW in 58 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 334 g CO₂ per kWh (Germany, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5% |
| Industrial power price | EUR 0.146 per kWh (Germany, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 8.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.2 °C (2001 to 2025) |
| Cooling degree days | 108 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.25 kWh per m² per day |
| Wind at 50 m | 4.5 m/s average |
| Water stress today | Medium - High (20-40%) (Germany) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Equinix MU1/MU3 - Munich to the power grid?
The nearest high-voltage substation in OpenStreetMap is Umspannwerk Seidlstraße (110 kV), about 200 m away.
How clean is the power for Equinix MU1/MU3 - Munich?
The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.
Who operates Equinix MU1/MU3 - Munich?
Equinix.
Data centers near Munich
- EdgeConneX Munich (EDCMUC01) 2.2 km
- euNetworks Colocation Muenchen 1 2.7 km
- Telekom Data-Center 3.3 km · 29 MW
- NorthC München 1 4.3 km
- NorthC Munich 1 4.4 km
- Arelion Munich MCN 5.6 km
- Siemens EAGLE Data Center 5.7 km · 2 MW
- EMC Home of Data MUC I/II - MuCon-X 6.4 km
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix CH3 - Elk Grove United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.