Data Center Directory

Portus/IPHH HH3 (Wendenstrasse 251)

Portus/IPHH HH3 (Wendenstrasse 251) is an operational data center operated by Portus Data Centers in Hamburg, Germany. Our footprint estimate of its power is about 9.7 MW.

Key facts

StatusOperational
OperatorPortus Data Centers
Facility power9.7 MW (range 4.9 MW to 16 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,623 m² building outline x 5 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 4,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks17 networks, 2 internet exchanges
PeeringDB.
Also known asGlobalConnect Hamburg (HAM3)
AddressWendenstraße 251
Coordinates53.55100, 10.03825
Websiteportusdatacenters.com/our-data-centers/hamburg

Power and grid

Nearest high-voltage substationUmspannwerk St. Georg, 110 kV, 1.4 km away (Hamburger Energienetze)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationHamburg/Ost, 380 kV, 8 km away
HV substations within 10 km35
Power plants within 50 km968 MW in 12 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity334 g CO₂ per kWh (Germany, 2025)
Average of all power made in the area. Ember.
Grid power mixwind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5%
Industrial power priceEUR 0.146 per kWh (Germany, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature9.2 °C
NASA POWER, average of 2001 to 2025.
Highest temperature33.5 °C (2001 to 2025)
Cooling degree days70 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.88 kWh per m² per day
Wind at 50 m6.9 m/s average
Water stress todayLow (<10%) (Hamburg)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Portus/IPHH HH3 (Wendenstrasse 251) use?

We estimate the facility power at about 9.7 MW. Estimate from building footprint, low confidence.

How close is Portus/IPHH HH3 (Wendenstrasse 251) to the power grid?

The nearest high-voltage substation in OpenStreetMap is Umspannwerk St. Georg (110 kV), about 1.4 km away.

How clean is the power for Portus/IPHH HH3 (Wendenstrasse 251)?

The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.

Who operates Portus/IPHH HH3 (Wendenstrasse 251)?

Portus Data Centers.

Data centers near Hamburg

More Portus Data Centers data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.