Data Center Directory

NorthC Hamburg

NorthC Hamburg is an operational data center operated by NorthC Deutschland in Hamburg, Germany. Our footprint estimate of its power is about 6.8 MW.

Key facts

StatusOperational
OperatorNorthC Deutschland
Facility power6.8 MW (range 3.4 MW to 11 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 5,648 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 2,900 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks18 networks, 1 internet exchanges
PeeringDB.
Also known asNorthC Hamburg 1
AddressSüderstrasse 198
Coordinates53.54799, 10.04365
Websitenorthcdatacenters.com/de

Power and grid

Grid carbon intensity334 g CO₂ per kWh (Germany, 2025)
Average of all power made in the area. Ember.
Grid power mixwind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5%
Industrial power priceEUR 0.146 per kWh (Germany, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature9.2 °C
NASA POWER, average of 2001 to 2025.
Highest temperature33.5 °C (2001 to 2025)
Cooling degree days70 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.88 kWh per m² per day
Wind at 50 m6.9 m/s average
Water stress todayLow (<10%) (Hamburg)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How much power does NorthC Hamburg use?

We estimate the facility power at about 6.8 MW. Estimate from building footprint, low confidence.

How clean is the power for NorthC Hamburg?

The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.

Who operates NorthC Hamburg?

NorthC Deutschland.

Data centers near Hamburg

More NorthC Deutschland data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.