Data Center Directory

Hub Europe

Hub Europe is an operational data center operated by Contabo in Durmersheim, Germany. Our footprint estimate of its power is about 1.5 MW.

Key facts

StatusOperational
OperatorContabo
Facility power1.5 MW (range 0.6 MW to 3.7 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 12,449 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 640 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asBuilding 1 · Building 2
Coordinates48.95532, 8.18071
Websitecontabo.com/blog/welcome-to-hub-europe-new-data-center-for-all-your-cloud-needs

Power and grid

Nearest high-voltage substationUnnamed substation, 110 kV, 8.7 km away (Netze BW)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationPoste électrique de Seltz, 225 kV, 9.3 km away
HV substations within 10 km3
Power plants within 50 km2.3 GW in 28 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity334 g CO₂ per kWh (Germany, 2025)
Average of all power made in the area. Ember.
Grid power mixwind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5%
Industrial power priceEUR 0.146 per kWh (Germany, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature10.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature39.8 °C (2001 to 2025)
Cooling degree days262 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.17 kWh per m² per day
Wind at 50 m5.5 m/s average
Water stress todayMedium - High (20-40%) (Germany)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Hub Europe use?

We estimate the facility power at about 1.5 MW. Estimate from building footprint, low confidence.

How close is Hub Europe to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (110 kV), about 8.7 km away.

How clean is the power for Hub Europe?

The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.

Who operates Hub Europe?

Contabo.

Data centers near Durmersheim

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.