Data Center Directory

Interxion PAR7

Interxion PAR7 is an operational data center operated by Digital Realty in La Courneuve, France. Our footprint estimate of its power is about 6.8 MW.

Key facts

StatusOperational
OperatorDigital Realty
Facility power6.8 MW (range 3.4 MW to 11 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 5,691 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 2,900 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates48.92542, 2.40215

Power and grid

Nearest high-voltage substationUnnamed substation, 225 kV, 200 m away (Interxion)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km55
Power plants within 50 km2.2 GW in 53 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity41 g CO₂ per kWh (France, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9%
Industrial power priceEUR 0.098 per kWh (France, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature10.9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature39.6 °C (2001 to 2025)
Cooling degree days130 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.19 kWh per m² per day
Wind at 50 m6.3 m/s average
Water stress todayLow - Medium (10-20%) (France)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Interxion PAR7 use?

We estimate the facility power at about 6.8 MW. Estimate from building footprint, low confidence.

How close is Interxion PAR7 to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (225 kV), about 200 m away.

How clean is the power for Interxion PAR7?

The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.

Who operates Interxion PAR7?

Digital Realty.

Data centers near La Courneuve

More Digital Realty data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.