JC2
JC2 is an operational data center operated by Princeton Digital in Jakarta, Cibitung, Indonesia. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Princeton Digital |
| Networks | 2 networks PeeringDB. |
| Address | Kawasan Industri MM2100, PT Princeton Digital Group Jalan Sumba Blok A-B, Kav. B12-1, Mekarwangi, Kec. Cikarang Bar., Kabupaten Bekasi, Jawa Barat 17530, Indonesia |
| Coordinates | -6.31439, 107.09038 |
| Website | princetondg.com/locations/indonesia/#jc1--jc2 |
Power and grid
| Nearest high-voltage substation | Gardu Induk Gandamekar, 150 kV, 2.1 km away (PLN) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | GISTET Tambun II, 500 kV, 10.3 km away |
| HV substations within 10 km | 9 |
| Power plants within 50 km | 10 GW in 22 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 705 g CO₂ per kWh (Indonesia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 69.4%, gas 11.6%, hydro 6.7%, bioenergy 5.3%, other renewables 3.4%. Clean power: 15.8% |
Climate and water
| Average temperature | 24.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.3 °C (2001 to 2025) |
| Cooling degree days | 2,507 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.01 kWh per m² per day |
| Wind at 50 m | 3.1 m/s average |
| Water stress today | Medium - High (20-40%) (Indonesia) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is JC2 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Gardu Induk Gandamekar (150 kV), about 2.1 km away.
How clean is the power for JC2?
The grid in Indonesia emits about 705 g CO₂ per kWh (2025). Largest sources: coal 69.4%, gas 11.6%, hydro 6.7%.
Who operates JC2?
Princeton Digital.
Data centers near Jakarta, Cibitung
- XLSmart Cibitung (JNB2) 1.1 km
- JC1 1.6 km
- DCI Indonesia (JK1) 1.6 km
- Graha Teknologi Bekasi 9.0 km
- GTN Data Center 9.2 km · 6 MW
- Biznet BigPOP Bekasi Jatimulya 9.2 km
- INFOTAMA HEXA BUILDING 9.3 km
- Hyperscale Data Center (HDC) 11.9 km
More Princeton Digital data centers
Sources
Correct this page or get the data