Data Center Directory

Princeton Digital JC3

Princeton Digital JC3 is an operational data center operated by Princeton Digital in Cikarang, Indonesia. Our footprint estimate of its power is about 14 MW.

Key facts

StatusOperational
OperatorPrinceton Digital
Facility power14 MW (range 7 MW to 22 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 11,609 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 6,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates-6.37467, 107.19029

Power and grid

Nearest high-voltage substationGardu Induk Data Center, 150 kV, 200 m away (PLN)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationGITET Cibatu, 500 kV, 3.1 km away
HV substations within 10 km11
Power plants within 50 km10 GW in 23 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity705 g CO₂ per kWh (Indonesia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 69.4%, gas 11.6%, hydro 6.7%, bioenergy 5.3%, other renewables 3.4%. Clean power: 15.8%

Climate and water

Average temperature24.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature35.3 °C (2001 to 2025)
Cooling degree days2,507 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.01 kWh per m² per day
Wind at 50 m3.1 m/s average
Water stress todayMedium - High (20-40%) (Indonesia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Princeton Digital JC3 use?

We estimate the facility power at about 14 MW. Estimate from building footprint, low confidence.

How close is Princeton Digital JC3 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Gardu Induk Data Center (150 kV), about 200 m away.

How clean is the power for Princeton Digital JC3?

The grid in Indonesia emits about 705 g CO₂ per kWh (2025). Largest sources: coal 69.4%, gas 11.6%, hydro 6.7%.

Who operates Princeton Digital JC3?

Princeton Digital.

Data centers near Cikarang

More Princeton Digital data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.