DIgital Edge CGK Campus
DIgital Edge CGK Campus is an operational data center operated by Digital Edge DC in Central Cikarang,, Indonesia. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Digital Edge DC |
| Networks | 2 networks PeeringDB. |
| Address | J5JW+R8, Pasirranji, Indonesia |
| Coordinates | -6.36734, 107.19582 |
| Website | digitaledgedc.com/products-services/data-centers/indonesia/#CGK |
Power and grid
| Nearest high-voltage substation | Gardu Induk Data Center, 150 kV, 1.1 km away (PLN) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | GITET Cibatu, 500 kV, 3.9 km away |
| HV substations within 10 km | 11 |
| Power plants within 50 km | 10 GW in 23 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 705 g CO₂ per kWh (Indonesia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 69.4%, gas 11.6%, hydro 6.7%, bioenergy 5.3%, other renewables 3.4%. Clean power: 15.8% |
Climate and water
| Average temperature | 24.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.3 °C (2001 to 2025) |
| Cooling degree days | 2,507 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.01 kWh per m² per day |
| Wind at 50 m | 3.1 m/s average |
| Water stress today | Medium - High (20-40%) (Indonesia) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is DIgital Edge CGK Campus to the power grid?
The nearest high-voltage substation in OpenStreetMap is Gardu Induk Data Center (150 kV), about 1.1 km away.
How clean is the power for DIgital Edge CGK Campus?
The grid in Indonesia emits about 705 g CO₂ per kWh (2025). Largest sources: coal 69.4%, gas 11.6%, hydro 6.7%.
Who operates DIgital Edge CGK Campus?
Digital Edge DC.
Data centers near Central Cikarang,
- Digital Hyperspace Jakarta 529 m · 6.7 MW
- Microsoft JKT05 644 m · 14 MW
- STTGDC JKT1 901 m
- STT Jakarta 1 941 m · 22 MW
- Princeton Digital JC3 1.0 km · 14 MW
- Amazon Web Services 1.4 km · 9.6 MW
- Hyperscale Data Center (HDC) 2.2 km
- GTN Data Center 4.0 km · 6 MW
More Digital Edge DC data centers
- Digital Edge OSA2 Japan
- Digital Edge TYO2 (ComSpace 1) - Tokyo Japan
- Digital Edge BOM1 India
- Digital Edge MNL1 (NARRA1) - Manila Philippines
- Digital Edge OSA1 - Osaka Japan
- Digital Edge PUS1 - Busan South Korea
- Digital Edge SEL1 - Seoul South Korea
- Digital Edge SEL2 SEL3 - Seoul South Korea
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.