Digital Edge OSA2
Digital Edge OSA2 is an operational data center operated by Digital Edge DC in Kobe, Japan. Our footprint estimate of its power is about 5.9 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Digital Edge DC |
| Facility power | 5.9 MW (range 3 MW to 9.5 MW) Estimate from building footprint, low confidence. Footprint estimate: about 4,956 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,500 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 1 networks, 1 internet exchanges PeeringDB. |
| Also known as | CTC Kobe |
| Address | 8 Chome-2-1 Kanokodai Kitamachi, Kita Ward |
| Coordinates | 34.86408, 135.21442 |
| Website | digitaledgedc.com/products/datacenters/japan#osa2 |
Power and grid
| Grid carbon intensity | 474 g CO₂ per kWh (Japan, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 32.7%, coal 31.8%, solar 10.8%, nuclear 9.2%, hydro 7.2%. Clean power: 33% |
Climate and water
| Water stress today | Low - Medium (10-20%) (Japan) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
|---|---|
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Digital Edge OSA2 use?
We estimate the facility power at about 5.9 MW. Estimate from building footprint, low confidence.
How clean is the power for Digital Edge OSA2?
The grid in Japan emits about 474 g CO₂ per kWh (2025). Largest sources: gas 32.7%, coal 31.8%, solar 10.8%.
Who operates Digital Edge OSA2?
Digital Edge DC.
Data centers near Kobe
- netXDC 4.6 km
- NTT 18.9 km
- スーパーコンピュータ「富岳」 23.4 km
- NEC神戸システムセンター 23.8 km · 7.6 MW
- 西日本電話電信白島ビル 25.9 km · 0.6 MW
- SCSK株式会社 data center in Minoh 26.1 km
- Equinix 26.8 km · 8.2 MW
- NTT Kitahama Data Center(Dojima Campus) 30.8 km
More Digital Edge DC data centers
- Digital Edge TYO2 (ComSpace 1) - Tokyo Japan
- Digital Edge BOM1 India
- DIgital Edge CGK Campus Indonesia
- Digital Edge MNL1 (NARRA1) - Manila Philippines
- Digital Edge OSA1 - Osaka Japan
- Digital Edge PUS1 - Busan South Korea
- Digital Edge SEL1 - Seoul South Korea
- Digital Edge SEL2 SEL3 - Seoul South Korea
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.