Microsoft JKT05
Microsoft JKT05 is an operational data center operated by Microsoft in Cikarang, Indonesia. Our footprint estimate of its power is about 14 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Microsoft |
| Facility power | 14 MW (range 6.9 MW to 22 MW) Estimate from building footprint, low confidence. Footprint estimate: about 11,537 m² building outline x 1 floor(s) x 1.2 kW/m². |
| AI chips | NVIDIA GPUs (some Microsoft Maia) Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips. |
| GPU capacity if all AI | about 6,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Microsoft JKT11 |
| Coordinates | -6.37234, 107.19288 |
Power and grid
| Grid carbon intensity | 705 g CO₂ per kWh (Indonesia, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | coal 69.4%, gas 11.6%, hydro 6.7%, bioenergy 5.3%, other renewables 3.4%. Clean power: 15.8% |
Climate and water
| Water stress today | Medium - High (20-40%) (Indonesia) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
|---|---|
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Microsoft JKT05 use?
We estimate the facility power at about 14 MW. Estimate from building footprint, low confidence.
What chips does Microsoft JKT05 use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).
How clean is the power for Microsoft JKT05?
The grid in Indonesia emits about 705 g CO₂ per kWh (2025). Largest sources: coal 69.4%, gas 11.6%, hydro 6.7%.
Who operates Microsoft JKT05?
Microsoft.
Data centers near Cikarang
- Digital Hyperspace Jakarta 260 m · 6.7 MW
- Princeton Digital JC3 386 m · 14 MW
- DIgital Edge CGK Campus 644 m
- Amazon Web Services 756 m · 9.6 MW
- STT Jakarta 1 924 m · 22 MW
- STTGDC JKT1 939 m
- Hyperscale Data Center (HDC) 1.7 km
- GTN Data Center 4.1 km · 6 MW
More Microsoft data centers
- Microsoft Fairwater Wisconsin United States
- Crusoe Abilene Expansion United States
- Microsoft Fairwater Atlanta United States
- Microsoft Goodyear United States
- Microsoft Boydton Data Center United States
- Microsoft Project Osmium United States
- OpenAI/Microsoft Goodyear Arizona United States
- Microsoft CYS Datacenter United States