Keppel Tokyo Data Centre 1
Keppel Tokyo Data Centre 1 is an operational data center in Yabe, Japan. Our footprint estimate of its power is about 42 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 42 MW (range 21 MW to 67 MW) Estimate from building footprint, low confidence. Footprint estimate: about 6,990 m² building outline x 5 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 18,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | 唐木田テクノロジービル |
| Coordinates | 35.61327, 139.40040 |
Power and grid
| Nearest high-voltage substation | 相模原変電所, 154 kV, 4.9 km away (東京電力パワーグリッド) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | 西東京変電所, 275 kV, 5.2 km away |
| HV substations within 10 km | 7 |
| Power plants within 50 km | 24 GW in 37 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 474 g CO₂ per kWh (Japan, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 32.7%, coal 31.8%, solar 10.8%, nuclear 9.2%, hydro 7.2%. Clean power: 33% |
Climate and water
| Average temperature | 13.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.5 °C (2001 to 2025) |
| Cooling degree days | 700 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.89 kWh per m² per day |
| Wind at 50 m | 5.4 m/s average |
| Water stress today | Medium - High (20-40%) (Kanagawa) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Keppel Tokyo Data Centre 1 use?
We estimate the facility power at about 42 MW. Estimate from building footprint, low confidence.
How close is Keppel Tokyo Data Centre 1 to the power grid?
The nearest high-voltage substation in OpenStreetMap is 相模原変電所 (154 kV), about 4.9 km away.
How clean is the power for Keppel Tokyo Data Centre 1?
The grid in Japan emits about 474 g CO₂ per kWh (2025). Largest sources: gas 32.7%, coal 31.8%, solar 10.8%.
Data centers near Yabe
- Data center in Yabe 346 m · 19 MW
- Tokyo West 1 347 m · 3.8 MW
- 野村総合研究所 東京第一DC 2.4 km · 16 MW
- NTT 5.2 km
- NTT 9.7 km · 2.1 MW
- NTT DOCOMO BUSINESS TK8 - Tokyo 14.6 km
- TSUBAME4.0 15.7 km · 1.4 MW
- NTT武蔵村山電話交換局 16.0 km · 1.6 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.