NTT DOCOMO BUSINESS TK8 - Tokyo
NTT DOCOMO BUSINESS TK8 - Tokyo is an operational data center operated by NTT Global Data Centers in Kawasaki-shi, Japan. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | NTT Global Data Centers |
| Address | 3-4-1 Inukura, Miyamae-ku |
| Coordinates | 35.58811, 139.55878 |
| Website | ntt.com/en/services/data-center/nexcenter.html |
Power and grid
| Nearest high-voltage substation | 荏田変電所, 275 kV, 3.8 km away (東京電力パワーグリッド) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 12 |
| Power plants within 50 km | 37 GW in 46 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 474 g CO₂ per kWh (Japan, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 32.7%, coal 31.8%, solar 10.8%, nuclear 9.2%, hydro 7.2%. Clean power: 33% |
Climate and water
| Average temperature | 13.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.5 °C (2001 to 2025) |
| Cooling degree days | 700 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.89 kWh per m² per day |
| Wind at 50 m | 5.4 m/s average |
| Water stress today | Medium - High (20-40%) (Kanagawa) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is NTT DOCOMO BUSINESS TK8 - Tokyo to the power grid?
The nearest high-voltage substation in OpenStreetMap is 荏田変電所 (275 kV), about 3.8 km away.
How clean is the power for NTT DOCOMO BUSINESS TK8 - Tokyo?
The grid in Japan emits about 474 g CO₂ per kWh (2025). Largest sources: gas 32.7%, coal 31.8%, solar 10.8%.
Who operates NTT DOCOMO BUSINESS TK8 - Tokyo?
NTT Global Data Centers.
Data centers near Kawasaki-shi
- Digital Edge TYO4, TYO5, TYO6 - Tokyo 6.2 km
- Rakuten 6.9 km
- TSUBAME4.0 8.2 km · 1.4 MW
- Secure Data Center Bekkan 11.0 km
- 野村総合研究所 東京第一DC 13.3 km · 16 MW
- NTT 13.4 km · 2.1 MW
- Broadband Tower - Shibuya Datacenter Bldg. 14.1 km
- Tokyo West 1 14.3 km · 3.8 MW
More NTT Global Data Centers data centers
- NTT VA10 United States
- NTT Frankfurt 2 Data Center (FRA2) Germany
- NTT PH1 Datacenter United States
- NTT Japan
- NTTData Data Center United States
- NTT Hemel Hempstead 4 Data Center (HH4) United Kingdom
- NTT Berlin 1 Data Center (BER1) Germany
- NTT London 1 United Kingdom