Tokyo West 1
Tokyo West 1 is an operational data center operated by Ada Infrastructure in Tama, Japan. Our footprint estimate of its power is about 3.8 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Ada Infrastructure |
| Facility power | 3.8 MW (range 1.9 MW to 6.1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 3,188 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Ada Infrastructure TKW1-1 · Karakida 1 Building |
| Address | 1-Chome-16-2 Karakida |
| Coordinates | 35.61368, 139.40420 |
| Website | adainfrastructure.com |
Power and grid
| Nearest high-voltage substation | 西東京変電所, 275 kV, 4.9 km away (電源開発送変電ネットワーク株式会社) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 7 |
| Power plants within 50 km | 25 GW in 38 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 474 g CO₂ per kWh (Japan, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 32.7%, coal 31.8%, solar 10.8%, nuclear 9.2%, hydro 7.2%. Clean power: 33% |
Climate and water
| Average temperature | 13.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.5 °C (2001 to 2025) |
| Cooling degree days | 700 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.89 kWh per m² per day |
| Wind at 50 m | 5.4 m/s average |
| Water stress today | Medium - High (20-40%) (Kanagawa) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Tokyo West 1 use?
We estimate the facility power at about 3.8 MW. Estimate from building footprint, low confidence.
How close is Tokyo West 1 to the power grid?
The nearest high-voltage substation in OpenStreetMap is 西東京変電所 (275 kV), about 4.9 km away.
How clean is the power for Tokyo West 1?
The grid in Japan emits about 474 g CO₂ per kWh (2025). Largest sources: gas 32.7%, coal 31.8%, solar 10.8%.
Who operates Tokyo West 1?
Ada Infrastructure.
Data centers near Tama
- Keppel Tokyo Data Centre 1 347 m · 42 MW
- Data center in Yabe 359 m · 19 MW
- 野村総合研究所 東京第一DC 2.2 km · 16 MW
- NTT 5.6 km
- NTT 9.6 km · 2.1 MW
- NTT DOCOMO BUSINESS TK8 - Tokyo 14.3 km
- TSUBAME4.0 15.5 km · 1.4 MW
- NTT武蔵村山電話交換局 16.0 km · 1.6 MW
More Ada Infrastructure data centers
- Ada Infrastructure (Docklands) United Kingdom
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.