KNWCWAXA - Kennewick Central Office
KNWCWAXA - Kennewick Central Office is an operational data center operated by Ziply Fiber in Kennewick, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Ziply Fiber |
| Networks | 1 networks PeeringDB. |
| Address | 4916 W Clearwater Ave |
| Coordinates | 46.21295, -119.18720 |
| Website | ziplyfiber.com/wholesale/data-centers/colocation |
Power and grid
| Nearest high-voltage substation | Angus Substation, 115 kV, 1.2 km away (Benton Public Utility District) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Franklin Substation, 230 kV, 11.4 km away |
| HV substations within 10 km | 19 |
| Utility | PUD No 1 Of Benton County (political subdivision) Electric retail service territory (HIFLD, US government). |
| Balancing authority | BPAT |
| Nearest gas pipeline | Northwest Pipeline, interstate pipeline, 100 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 4.1 GW in 9 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 135 g CO₂ per kWh (Washington, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 62.8%, gas 15.7%, wind 8.3%, nuclear 7.5%, coal 3%. Clean power: 80.9% |
| Industrial power price | USD 0.074 per kWh (Washington, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.3 °C (2001 to 2025) |
| Cooling degree days | 507 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.22 kWh per m² per day |
| Wind at 50 m | 5.5 m/s average |
| Water stress today | Low - Medium (10-20%) (Washington) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is KNWCWAXA - Kennewick Central Office to the power grid?
The nearest high-voltage substation in OpenStreetMap is Angus Substation (115 kV), about 1.2 km away. The local utility is PUD No 1 Of Benton County, in the BPAT balancing area.
How clean is the power for KNWCWAXA - Kennewick Central Office?
The grid in Washington emits about 135 g CO₂ per kWh (2025). Largest sources: hydro 62.8%, gas 15.7%, wind 8.3%.
Who operates KNWCWAXA - Kennewick Central Office?
Ziply Fiber.
Data centers near Kennewick
- Amazon Web Services 32.7 km · 19 MW
- Amazon Web Services 32.7 km · 19 MW
- Amazon Web Services 33.4 km · 22 MW
- Amazon Web Services 33.7 km · 1.4 MW
- Amazon Web Services 33.8 km · 24 MW
- AWS Umatilla Data Center 35.8 km · 78 MW
- Amazon Web Services 35.9 km · 20 MW
- Amazon Web Services 36.1 km · 21 MW
More Ziply Fiber data centers
- BOTHWAXB - Bothell Central Office United States
- BVTNORXB - Beaverton Central Office United States
- CRALIDXX - Coeur d'Alene Central Office United States
- EVRTWAXA - Everett Primary Central Office United States
- GRHMORXB - Gresham Central Office United States
- HLBOORXH - Hawthorne Central Office United States
- SMRWORXA - Somerset West Central Office United States
- TGRDORXA - Tigard Central Office United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.