Lost River Data Center is an operational data center operated by Western Kentucky University in Bowling Green, United States. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorWestern Kentucky University
Networks1 networks
PeeringDB.
Address2413 Nashville Rd
Coordinates36.96231, -86.47094
Websitewku.edu/accelerator/crd_lost_river.php

Power and grid

Nearest high-voltage substationUnnamed substation, 161 kV, 1.8 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km4
UtilityCity Of Bowling Green (municipal)
Electric retail service territory (HIFLD, US government).
Balancing authorityTVA
Nearest gas pipelineTexas Gas Transmission Co, interstate pipeline, 3.8 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km173 MW in 1 plant
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity769 g CO₂ per kWh (Kentucky, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 65.8%, gas 25.8%, hydro 5.3%, solar 2.4%, bioenergy 0.5%. Clean power: 8.2%
Industrial power priceUSD 0.074 per kWh (Kentucky, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature14 °C
NASA POWER, average of 2001 to 2025.
Highest temperature41.5 °C (2001 to 2025)
Cooling degree days806 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.16 kWh per m² per day
Wind at 50 m5.2 m/s average
Water stress todayLow - Medium (10-20%) (Kentucky)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How close is Lost River Data Center to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (161 kV), about 1.8 km away. The local utility is City Of Bowling Green, in the TVA balancing area.

How clean is the power for Lost River Data Center?

The grid in Kentucky emits about 769 g CO₂ per kWh (2025). Largest sources: coal 65.8%, gas 25.8%, hydro 5.3%.

Who operates Lost River Data Center?

Western Kentucky University.

Data centers near Bowling Green

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.