MEO data center in Aljustrel

MEO data center in Aljustrel is an operational data center operated by MEO in Aljustrel, Portugal. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorMEO
Coordinates38.05943, -8.11381

Power and grid

Nearest high-voltage substationSubestação de Ferreira do Alentejo, 400 kV, 1.3 km away (REN)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km1
Power plants within 50 km332 MW in 28 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity128 g CO₂ per kWh (Portugal, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 29.7%, wind 26.8%, solar 17.3%, gas 16.5%, bioenergy 6.6%. Clean power: 80.9%
Industrial power priceEUR 0.090 per kWh (Portugal, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature16.9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature45.8 °C (2001 to 2025)
Cooling degree days890 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.9 kWh per m² per day
Wind at 50 m5.8 m/s average
Water stress todayHigh (40-80%) (Beja)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How close is MEO data center in Aljustrel to the power grid?

The nearest high-voltage substation in OpenStreetMap is Subestação de Ferreira do Alentejo (400 kV), about 1.3 km away.

How clean is the power for MEO data center in Aljustrel?

The grid in Portugal emits about 128 g CO₂ per kWh (2025). Largest sources: hydro 29.7%, wind 26.8%, solar 17.3%.

Who operates MEO data center in Aljustrel?

MEO.

Data centers near Aljustrel

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.