Start Campus SIN02
Start Campus SIN02 is an operational data center operated by Start Campus in Sines, Portugal. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Start Campus |
| Address | ZILS Zona C1.1 Lote 1 |
| Coordinates | 37.96228, -8.87131 |
| Website | startcampus.pt |
Power and grid
| Grid carbon intensity | 128 g CO₂ per kWh (Portugal, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | hydro 29.7%, wind 26.8%, solar 17.3%, gas 16.5%, bioenergy 6.6%. Clean power: 80.9% |
| Industrial power price | EUR 0.090 per kWh (Portugal, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 16.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.7 °C (2001 to 2025) |
| Cooling degree days | 597 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.87 kWh per m² per day |
| Wind at 50 m | 6.1 m/s average |
| Water stress today | High (40-80%) (Portugal) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Start Campus SIN02?
The grid in Portugal emits about 128 g CO₂ per kWh (2025). Largest sources: hydro 29.7%, wind 26.8%, solar 17.3%.
Who operates Start Campus SIN02?
Start Campus.
Data centers near Sines
- Start Campus Sines Data Campus 669 m · 40 MW
- EllaLink Sines Vasco de Gama CLS 5.1 km
- Start Campus SIN01 5.7 km
- Start Campus 5.9 km · 16 MW
- MEO data center in Aljustrel 67.2 km
More Start Campus data centers
- Start Campus SIN01 Portugal
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.