Start Campus

Start Campus is an operational data center in Sines, Portugal. Our footprint estimate of its power is about 16 MW.

Key facts

StatusOperational
Facility power16 MW (range 6.2 MW to 39 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 129,429 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 6,800 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asStart SIN01
Coordinates37.93505, -8.81341
Websitestartcampus.pt/en

Power and grid

Grid carbon intensity128 g CO₂ per kWh (Portugal, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 29.7%, wind 26.8%, solar 17.3%, gas 16.5%, bioenergy 6.6%. Clean power: 80.9%
Industrial power priceEUR 0.090 per kWh (Portugal, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature16.9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature40.7 °C (2001 to 2025)
Cooling degree days597 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.87 kWh per m² per day
Wind at 50 m6.1 m/s average
Water stress todayHigh (40-80%) (Portugal)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Start Campus use?

We estimate the facility power at about 16 MW. Estimate from building footprint, low confidence.

How clean is the power for Start Campus?

The grid in Portugal emits about 128 g CO₂ per kWh (2025). Largest sources: hydro 29.7%, wind 26.8%, solar 17.3%.