Meta Clonee 1 Data Center
Meta Clonee 1 Data Center is an operational data center operated by Meta in Dunboyne, Ireland. Our footprint estimate of its power is about 81 MW. Likely chips: NVIDIA GPUs (some Meta MTIA) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Meta |
| Facility power | 81 MW (range 41 MW to 130 MW) Estimate from building footprint, low confidence. Footprint estimate: about 67,856 m² building outline x 1 floor(s) x 1.2 kW/m². |
| AI chips | NVIDIA GPUs (some Meta MTIA) Guess from the operator, not confirmed. Meta trains on NVIDIA GPUs and adds in-house MTIA chips for inference. |
| GPU capacity if all AI | about 35,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Meta Clonee 2 Data Center |
| Coordinates | 53.41693, -6.43308 |
Power and grid
| Grid carbon intensity | 261 g CO₂ per kWh (Ireland, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 48.1%, wind 37.8%, solar 4.7%, bioenergy 3.3%, oil and other fossil 2.9%. Clean power: 47.8% |
| Industrial power price | EUR 0.206 per kWh (Ireland, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 24.3 °C (2001 to 2025) |
| Cooling degree days | 1 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.74 kWh per m² per day |
| Wind at 50 m | 8 m/s average |
| Water stress today | Low (<10%) (Ireland) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Meta Clonee 1 Data Center use?
We estimate the facility power at about 81 MW. Estimate from building footprint, low confidence.
What chips does Meta Clonee 1 Data Center use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Meta MTIA).
How clean is the power for Meta Clonee 1 Data Center?
The grid in Ireland emits about 261 g CO₂ per kWh (2025). Largest sources: gas 48.1%, wind 37.8%, solar 4.7%.
Who operates Meta Clonee 1 Data Center?
Meta.
Data centers near Dunboyne
- Meta Clonee Data Center 333 m · 262 MW
- Meta Clonee 3 Data Center 586 m · 82 MW
- Meta Clonee 6 Data Center 998 m · 89 MW
- Amazon Dublin Mulhuddart Campus 3.4 km · 45 MW
- Servecentric (Blanchardstown) 4.0 km
- Digital Realty DUB10 4.2 km · 20 MW
- Equinix 4.3 km · 8.5 MW
- Digital Realty Dublin DUB10 4.4 km
More Meta data centers
- Meta Hyperion United States
- QTS Cedar Rapids United States
- Meta Prometheus United States
- Meta Bowling Green United States
- Meta Montgomery United States
- QTS Eagle Mountain United States
- Meta Huntsville Data Center United States
- Altoona Meta Data Center United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.