Meta Richland Parish Data Center

Meta Richland Parish Data Center is a data center under construction operated by Meta in Bastrop, United States. No power figure is public for this site yet. Likely chips: NVIDIA GPUs (some Meta MTIA) (guess).

Key facts

StatusUnder construction
OperatorMeta
AI chipsNVIDIA GPUs (some Meta MTIA)
Guess from the operator, not confirmed. Meta trains on NVIDIA GPUs and adds in-house MTIA chips for inference.
Coordinates32.50238, -91.63603
Websitedatacenters.atmeta.com/richland-parish-data-center

Power and grid

Nearest high-voltage substationUnnamed substation, 115 kV, 2.8 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km4
UtilityNortheast Louisiana Power Coop INC. (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authorityMISO
Nearest gas pipelineANR Pipeline Co, interstate pipeline, 400 m away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km2.1 GW in 6 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity460 g CO₂ per kWh (Louisiana, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 72.1%, nuclear 14.9%, coal 5.4%, solar 2.7%, oil and other fossil 2%. Clean power: 20.5%
Industrial power priceUSD 0.061 per kWh (Louisiana, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature18.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature43 °C (2001 to 2025)
Cooling degree days1,478 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.63 kWh per m² per day
Wind at 50 m5.5 m/s average
Water stress todayLow - Medium (10-20%) (Louisiana)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

What chips does Meta Richland Parish Data Center use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Meta MTIA).

How close is Meta Richland Parish Data Center to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (115 kV), about 2.8 km away. The local utility is Northeast Louisiana Power Coop INC., in the MISO balancing area.

How clean is the power for Meta Richland Parish Data Center?

The grid in Louisiana emits about 460 g CO₂ per kWh (2025). Largest sources: gas 72.1%, nuclear 14.9%, coal 5.4%.

Who operates Meta Richland Parish Data Center?

Meta.

Data centers near Bastrop

More Meta data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.