Meta Richland Parish Data Center is a data center under construction operated by Meta in Bastrop, United States. No power figure is public for this site yet. Likely chips: NVIDIA GPUs (some Meta MTIA) (guess).
Key facts
| Status | Under construction |
|---|---|
| Operator | Meta |
| AI chips | NVIDIA GPUs (some Meta MTIA) Guess from the operator, not confirmed. Meta trains on NVIDIA GPUs and adds in-house MTIA chips for inference. |
| Coordinates | 32.50238, -91.63603 |
| Website | datacenters.atmeta.com/richland-parish-data-center |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 115 kV, 2.8 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 4 |
| Utility | Northeast Louisiana Power Coop INC. (cooperative) Electric retail service territory (HIFLD, US government). |
| Balancing authority | MISO |
| Nearest gas pipeline | ANR Pipeline Co, interstate pipeline, 400 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 2.1 GW in 6 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 460 g CO₂ per kWh (Louisiana, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 72.1%, nuclear 14.9%, coal 5.4%, solar 2.7%, oil and other fossil 2%. Clean power: 20.5% |
| Industrial power price | USD 0.061 per kWh (Louisiana, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 18.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 43 °C (2001 to 2025) |
| Cooling degree days | 1,478 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.63 kWh per m² per day |
| Wind at 50 m | 5.5 m/s average |
| Water stress today | Low - Medium (10-20%) (Louisiana) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
What chips does Meta Richland Parish Data Center use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Meta MTIA).
How close is Meta Richland Parish Data Center to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (115 kV), about 2.8 km away. The local utility is Northeast Louisiana Power Coop INC., in the MISO balancing area.
How clean is the power for Meta Richland Parish Data Center?
The grid in Louisiana emits about 460 g CO₂ per kWh (2025). Largest sources: gas 72.1%, nuclear 14.9%, coal 5.4%.
Who operates Meta Richland Parish Data Center?
Meta.
Data centers near Bastrop
- Meta Hyperion 4.0 km
More Meta data centers
- Meta Hyperion United States
- QTS Cedar Rapids United States
- Meta Prometheus United States
- Meta Bowling Green United States
- Meta Montgomery United States
- QTS Eagle Mountain United States
- Meta Huntsville Data Center United States
- Altoona Meta Data Center United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.