Miejska Sieć Komputerowa CzestMAN

Miejska Sieć Komputerowa CzestMAN is an operational data center in Częstochowa, Poland. No power figure is public for this site yet.

Key facts

StatusOperational
Coordinates50.82199, 19.11110

Power and grid

Nearest high-voltage substationStacja elektroenergetyczna 110/15kV „SE Sikorskiego”, 110 kV, 600 m away (Tauron)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationStacja elektroenergetyczna 220/110kV „SE Aniołów”, 220 kV, 2.5 km away
HV substations within 10 km19
Power plants within 50 km75 MW in 6 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity591 g CO₂ per kWh (Poland, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 50.6%, gas 14.4%, wind 13.9%, solar 11.3%, bioenergy 4.9%. Clean power: 31.2%
Industrial power priceEUR 0.169 per kWh (Poland, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature37.4 °C (2001 to 2025)
Cooling degree days205 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.04 kWh per m² per day
Wind at 50 m6.3 m/s average
Water stress todayLow - Medium (10-20%) (Poland)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How close is Miejska Sieć Komputerowa CzestMAN to the power grid?

The nearest high-voltage substation in OpenStreetMap is Stacja elektroenergetyczna 110/15kV „SE Sikorskiego” (110 kV), about 600 m away.

How clean is the power for Miejska Sieć Komputerowa CzestMAN?

The grid in Poland emits about 591 g CO₂ per kWh (2025). Largest sources: coal 50.6%, gas 14.4%, wind 13.9%.