NCI Australia Gadi
NCI Australia Gadi is an operational AI data center operated by National Computational Infrastructure Australia in Mermaid Waters, Australia. Its power is about 0.4 MW. Epoch AI estimates about 40 H100-equivalent AI chips (NVIDIA Tesla V100 SXM2).
Key facts
| Status | Operational |
|---|---|
| Operator | National Computational Infrastructure Australia |
| Facility power | 0.4 MW Reported (Epoch AI or owner data) |
| AI compute | 40 H100-equivalents |
| AI chips | NVIDIA Tesla V100 SXM2 Reported (Epoch AI or owner data) |
| Chip count | 640 Largest reported cluster at this site (Epoch AI). |
| GPU capacity if all AI | about 180 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Canberra ACT 2601, Australia |
| Coordinates | -28.05243, 153.42490 |
Power and grid
| Nearest high-voltage substation | Broadbeach substation, 110 kV, 3 km away (Energex) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Mudgeeraba Substation, 275 kV, 5.3 km away |
| HV substations within 10 km | 7 |
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 22.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 31.9 °C (2001 to 2025) |
| Cooling degree days | 1,402 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.15 kWh per m² per day |
| Wind at 50 m | 7.2 m/s average |
| Water stress today | Low - Medium (10-20%) (Queensland) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
GPU clusters at this site
| Cluster | Chips | Count | Power | Since |
|---|---|---|---|---|
| NCI Australia Gadi | NVIDIA Tesla V100 SXM2 | 640 | 0.4 MW | 2020-01-23 |
Source: Epoch AI GPU Clusters.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does NCI Australia Gadi use?
Public data puts the facility power at about 0.4 MW. Reported (Epoch AI or owner data).
What chips does NCI Australia Gadi use?
Reported chips: NVIDIA Tesla V100 SXM2.
How close is NCI Australia Gadi to the power grid?
The nearest high-voltage substation in OpenStreetMap is Broadbeach substation (110 kV), about 3 km away.
How clean is the power for NCI Australia Gadi?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates NCI Australia Gadi?
National Computational Infrastructure Australia.
Data centers near Mermaid Waters
- Silver @ Exchange 3.3 km
- Nexon Gold Coast DC1 5.3 km
- Fujitsu Eight Mile Plains 61.4 km
- Host Networks BNE1 61.5 km
- Interactive Brisbane 61.9 km
- Polaris Data Centre 66.1 km
- Digital Sense Brisbane 77.0 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.