Nexon Gold Coast DC1 is an operational data center operated by NEXON ASIA PACIFIC in Gold Coast, Australia. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorNEXON ASIA PACIFIC
Networks6 networks
PeeringDB.
Address50 Appel St, Surfers Paradise
Coordinates-28.00494, 153.42809
Websitenexon.com.au

Power and grid

Nearest high-voltage substationUnnamed substation, 110 kV, 1.9 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationMolendinar Substation, 275 kV, 7.2 km away
HV substations within 10 km5
Grid carbon intensity518 g CO₂ per kWh (Australia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8%

Climate and water

Average temperature22.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature31.9 °C (2001 to 2025)
Cooling degree days1,402 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.15 kWh per m² per day
Wind at 50 m7.2 m/s average
Water stress todayLow - Medium (10-20%) (Queensland)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How close is Nexon Gold Coast DC1 to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (110 kV), about 1.9 km away.

How clean is the power for Nexon Gold Coast DC1?

The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.

Who operates Nexon Gold Coast DC1?

NEXON ASIA PACIFIC.

Data centers near Gold Coast

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.