Data Center Directory

Nebius 8k Finland

Nebius 8k Finland is an operational AI data center operated by Nebius AI in Mäntsälä, Finland. Its power is about 11 MW. Epoch AI estimates about 8,000 H100-equivalent AI chips (NVIDIA H100 SXM5 80GB).

Key facts

StatusOperational
OperatorNebius AI
Facility power11 MW
Reported (Epoch AI or owner data)
AI compute8,000 H100-equivalents
AI chipsNVIDIA H100 SXM5 80GB
Reported (Epoch AI or owner data)
Chip count8,000
Largest reported cluster at this site (Epoch AI).
GPU capacity if all AIabout 4,900 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asGlobal DC OY
AddressMoreenikatu 6, 04600 Mäntsälä, Finland
Opened2015
Coordinates60.62952, 25.26336

Power and grid

Nearest high-voltage substationHaarajoki SA, 110 kV, 17 km away (Väylävirasto)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationHikiän sähköasema, 400 kV, 22.9 km away
Power plants within 50 km1.0 GW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity59 g CO₂ per kWh (Finland, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 39.8%, wind 27.4%, hydro 15.1%, bioenergy 12.5%, oil and other fossil 2.3%. Clean power: 96.2%
Industrial power priceEUR 0.076 per kWh (Finland, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature5.3 °C
NASA POWER, average of 2001 to 2025.
Highest temperature31.1 °C (2001 to 2025)
Cooling degree days46 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.57 kWh per m² per day
Wind at 50 m4.6 m/s average
Water stress todayLow (<10%) (Finland)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

GPU clusters at this site

ClusterChipsCountPowerSince
Nebius ISEGNVIDIA H100 SXM5 80GB1,5202.2 MW2023-11-01
Nebius 8k Finland Phase 1NVIDIA H100 SXM5 80GB8,00011 MW2024-05-10

Source: Epoch AI GPU Clusters.

Satellite view

Questions

How much power does Nebius 8k Finland use?

Public data puts the facility power at about 11 MW. Reported (Epoch AI or owner data).

What chips does Nebius 8k Finland use?

Reported chips: NVIDIA H100 SXM5 80GB.

How close is Nebius 8k Finland to the power grid?

The nearest high-voltage substation in OpenStreetMap is Haarajoki SA (110 kV), about 17 km away.

How clean is the power for Nebius 8k Finland?

The grid in Finland emits about 59 g CO₂ per kWh (2025). Largest sources: nuclear 39.8%, wind 27.4%, hydro 15.1%.

Who operates Nebius 8k Finland?

Nebius AI.

Data centers near Mäntsälä

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.