Nebius Mantsala
Nebius Mantsala is an operational data center that is still expanding, operated by Nebius in Mäntsälä, Finland. Its power is about 90 MW, growing to about 196 MW by 2027-12. Epoch AI estimates about 49,000 H100-equivalent AI chips (H100, B300, H200).
Power demand is growing at this site
Key facts
| Status | Operational, expanding |
|---|---|
| Operator | Nebius |
| Users | Microsoft (speculative) |
| Facility power | 90 MW Reported (Epoch AI or owner data) |
| IT power | 75 MW |
| Planned power | 196 MW by 2027-12-31 Epoch AI timeline projection. |
| AI compute | 49,000 H100-equivalents → 226,000 planned |
| AI chips | H100, B300, H200 Reported (Epoch AI or owner data) |
| GPU capacity if all AI | about 42,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 2.8 billion → 5.5 billion planned Epoch AI estimate, 2025 USD. |
| Coordinates | 60.63534, 25.31593 (city level) |
Power and grid
| Nearest high-voltage substation | Haarajoki SA, 110 kV, 18.9 km away (Väylävirasto) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Hikiän sähköasema, 400 kV, 25 km away |
| Power plants within 50 km | 1.0 GW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 59 g CO₂ per kWh (Finland, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 39.8%, wind 27.4%, hydro 15.1%, bioenergy 12.5%, oil and other fossil 2.3%. Clean power: 96.2% |
| Industrial power price | EUR 0.076 per kWh (Finland, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 5.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 31.1 °C (2001 to 2025) |
| Cooling degree days | 46 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.57 kWh per m² per day |
| Wind at 50 m | 4.6 m/s average |
| Water stress today | Low (<10%) (Finland) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2024-10-08 | 48 MW | 25,000 | [Nebius announces expansion of Mantsala campus to 75MW.](https://nebius.com/newsroom/nebius-to-triple-capacity-at-finland-data-center-to-75-mw) |
| 2025-11-14 | 48 MW | 25,000 | Satellite imagery suggests that installation of the cooling units is finalizing on the expansion building. Construction equipment remains around the site. We do not believe the building is operational at this point. |
| 2026-03-31 | 90 MW | 49,000 | [Nebius announces that the expansion to 75MW is operational at the beginning of 2026.](https://nebius.com/newsroom/nebius-to-construct-310-mw-ai-factory-in-finland) |
| 2026-06-29 | 90 MW | 49,000 | All three buildings in the first phase are operational. |
| 2027-12-31 (projected) | 196 MW | 226,000 | [According to company estimates, the second expansion of 70MW will be complete by the end of 2027.](https://www.linkedin.com/posts/at-earnings-we-said-nebius-is-expanding-its-share-7493603318020370433-hkGo/?utm_source=share&utm_medium=member_ios&rcm=ACoAAAA0mUUBRa3Pv7LQtyPOfMvNdkHncgpQUmc) |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2024-10-08 | H100 | 25,284 | Estimate |
| 2026-03-31 | B300 | 864 | Estimate |
| 2026-03-31 | H200 | 21,061 | Estimate |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Nebius Mantsala use?
Public data puts the facility power at about 90 MW, with about 196 MW planned by 2027. Reported (Epoch AI or owner data).
What chips does Nebius Mantsala use?
Reported chips: H100, B300, H200.
How close is Nebius Mantsala to the power grid?
The nearest high-voltage substation in OpenStreetMap is Haarajoki SA (110 kV), about 18.9 km away.
How clean is the power for Nebius Mantsala?
The grid in Finland emits about 59 g CO₂ per kWh (2025). Largest sources: nuclear 39.8%, wind 27.4%, hydro 15.1%.
Who operates Nebius Mantsala?
Nebius. Reported users: Microsoft.
Data centers near Mäntsälä
- Global DC OY 2.9 km · 4 MW
- Nebius 8k Finland 2.9 km · 11 MW
- Hetzner data center - HEL1 36.1 km · 18 MW
- Hetzner Online HEL1 (Helsinki) 36.3 km
- Verne Helsinki 38.7 km · 15 MW
- Equinix HE4 - Helsinki, Hansa 46.9 km
- Equinix HE5 - Helsinki, Viikinmäki 49.6 km · 5.9 MW
- Mediam Helsinki Datacenter 52.3 km
More Nebius data centers
- Microsoft-Nebius New Jersey United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.