Nebius Mantsala

Nebius Mantsala is an operational data center that is still expanding, operated by Nebius in Mäntsälä, Finland. Its power is about 90 MW, growing to about 196 MW by 2027-12. Epoch AI estimates about 49,000 H100-equivalent AI chips (H100, B300, H200).

Power demand is growing at this site

Key facts

StatusOperational, expanding
OperatorNebius
UsersMicrosoft (speculative)
Facility power90 MW
Reported (Epoch AI or owner data)
IT power75 MW
Planned power196 MW by 2027-12-31
Epoch AI timeline projection.
AI compute49,000 H100-equivalents → 226,000 planned
AI chipsH100, B300, H200
Reported (Epoch AI or owner data)
GPU capacity if all AIabout 42,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Capital costUSD 2.8 billion → 5.5 billion planned
Epoch AI estimate, 2025 USD.
Coordinates60.63534, 25.31593 (city level)

Power and grid

Nearest high-voltage substationHaarajoki SA, 110 kV, 18.9 km away (Väylävirasto)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationHikiän sähköasema, 400 kV, 25 km away
Power plants within 50 km1.0 GW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity59 g CO₂ per kWh (Finland, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 39.8%, wind 27.4%, hydro 15.1%, bioenergy 12.5%, oil and other fossil 2.3%. Clean power: 96.2%
Industrial power priceEUR 0.076 per kWh (Finland, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature5.3 °C
NASA POWER, average of 2001 to 2025.
Highest temperature31.1 °C (2001 to 2025)
Cooling degree days46 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.57 kWh per m² per day
Wind at 50 m4.6 m/s average
Water stress todayLow (<10%) (Finland)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Build timeline

DatePowerH100eWhat the satellite images and filings show
2024-10-0848 MW25,000[Nebius announces expansion of Mantsala campus to 75MW.](https://nebius.com/newsroom/nebius-to-triple-capacity-at-finland-data-center-to-75-mw)
2025-11-1448 MW25,000Satellite imagery suggests that installation of the cooling units is finalizing on the expansion building. Construction equipment remains around the site. We do not believe the building is operational at this point.
2026-03-3190 MW49,000[Nebius announces that the expansion to 75MW is operational at the beginning of 2026.](https://nebius.com/newsroom/nebius-to-construct-310-mw-ai-factory-in-finland)
2026-06-2990 MW49,000All three buildings in the first phase are operational.
2027-12-31 (projected)196 MW226,000[According to company estimates, the second expansion of 70MW will be complete by the end of 2027.](https://www.linkedin.com/posts/at-earnings-we-said-nebius-is-expanding-its-share-7493603318020370433-hkGo/?utm_source=share&utm_medium=member_ios&rcm=ACoAAAA0mUUBRa3Pv7LQtyPOfMvNdkHncgpQUmc)

Source: Epoch AI Frontier Data Centers.

Chip deployments

DateChipUnitsBasis
2024-10-08H10025,284Estimate
2026-03-31B300864Estimate
2026-03-31H20021,061Estimate

Satellite view

Questions

How much power does Nebius Mantsala use?

Public data puts the facility power at about 90 MW, with about 196 MW planned by 2027. Reported (Epoch AI or owner data).

What chips does Nebius Mantsala use?

Reported chips: H100, B300, H200.

How close is Nebius Mantsala to the power grid?

The nearest high-voltage substation in OpenStreetMap is Haarajoki SA (110 kV), about 18.9 km away.

How clean is the power for Nebius Mantsala?

The grid in Finland emits about 59 g CO₂ per kWh (2025). Largest sources: nuclear 39.8%, wind 27.4%, hydro 15.1%.

Who operates Nebius Mantsala?

Nebius. Reported users: Microsoft.